Reason for delay
(LTT-NZM/Load-20 Coaches), Train detained at BSL Station for loco changing due to I/C loco cab-1 LP side look out glass) cracked after two peacock hitted with look out glass further O/G loco after EOT, loco BP & FP ok but FP pressure not coming in Guard's SLR, C&W Staff allowed with 5 kg/cm2, FP then continuity test done and worked.IA-09.08.16, POH/24.05.15, Time-20.35-21.22 hrs. Loco with same train to JHS.