Now only 5 days are left for the historical NG section of JBP-NIR to be vanished from the IR network and before that moment to be happened the planning of pacer execution of JBP-NIR-BTC BG project is started and below are some important points-
1-Before...
more... the Megablock WCR being allotted the SECR Howbagh land after RB Approval.
2-Now WCR can make many plans to use that Howbagh land either for commercial use or for new washing appron/parking yard as part of the making of terminal of MML stn. in near future and for that WCR already sent fresh proposal to RB and now WCR is just waiting for the approval.
3-SECR is also handing over the work of making New BG/3rd line b/w KEQ(Kachepura)-JBP as part of JBP-BTC-G BG project so that movement of G/BTC/NIR bound trains frm JBP shud be easier and they dont have to wait at any signal for clearance and WCR also sent one proposal for the 3rd line b/w KEQ-JBP to RB and hopefully it will be approved and 3rd line will b crossing under the unused area of shastri bridge as shown in the pic.
4-In near future most of the passengers goin towards NIR/BTC/G will be given halt at KEQ and for this new stn. building is being constructing and one big ramp is constructing over the drainage with the help of JBP NNJ so that platform can be built on it.
5-It good to see nw SECR and WCR is working together and taking responsiblity to complete either one or two work comes under this project very fastly and this bonding will help this imp. project to complete soon.
6-New BG Line b/w Sagda-KEQ is goin to be built and for this sleepers also being layed new KEQ and as soon as base survey will b over new line will b layed. And on this sectio Garha st. also comes which will become a main stn. for SECR to handle and passing the JBP/G/BTC/NIR bound trains by halting them at Garha and passing other trains.
7-JBP-NIR-BTC-G section will be electrified in near future along with BGFied
8-KEQ stn. will play a role like link Jn. from where G/BTC bound new BG line will be diverting towards G/NIR/BTC and it is sure that as soon as this shorter route will be open in near future most of the south trains will chose this route as thier favorite bcoz of timesaving and non congestion.
9-IT is quite sure that this time JBP-G BG project will b over asap as both SECR n WCR is seriously giving efforts to complete this high importance project soon.
10-Now after closure of JBP-BTC NG section it is sure that work of BG will get very high pace and it is quite sure that future for JBP Jn. is very much brighter and JBP jN. will become a gr8 Jn. for south corridor in near future.