Trial run of a railway engine started Friday between Begunia and Rajsunakhala, a 9.5-km stretch of the Khurda-Bolangir railway line.
The railway engine started from Begunia at 12:30 pm and reached Sunakhala at 1:40 pm
LINE WILL BE INSPECTED BY COMMISSIONER OF RAILWAY SAFETY BEFORE ITS COMMISSIONING