Report is as follows :-
1. There is an unknown work going on.. Although the work is invisible still going on and workers are invisible too.
2. GD Jn. Didn't trolled my train in any manner.
3. It was raining very heavily and I enjoyed the run with my camera recording rainy videos.
4....
more... Trolling was done by LKO NR on both UP and DOWN trip.
5. Lko-cnb section is awesome now covered 18 mins enroute till leftbank station.
6. Ye ganga k bridge ka kch kro Bhai.. Iski tou awaz bhi badal gayi hai Ab.. :O aur upar se tanashah ban k ROK dete hain.. Bridge pe.. Jaise gira k hi maanenge.
7.UP line of GD-LKO section or GD-BBK section is fine without any problem.
8.Spotted no e-locos so little bit sad.
9.Quite depressed with the run of 12402 Magadh Express.. Iska kch krna hoga IR ko..
10. Lko outer needs 2 more lines to allow parallel entry of trains from bbk/SLN side..
11.LKO is going deep into earth regarding maintenance these days... Thankfully I don't need to walk upon those broken platforms.
12. As one of my co-admin told me earlier that NER takes block these days on downline means some track work is going on between CLJ-GD.
13. Expansion of FOB at Gonda Jn. Is needed and rennovatiom of FOB,PF-2 building, PF-3 is required too.
14. Is gonda diesel shed going to vanish..? No maintainence of shed there although they maintain loco's which fails enroute while running with a long distance train.
15.Before every express /superfast train departs a freight from GD ! O.o Funny isn't it..? And trolls the train till some extent.