As soon as JBP-NIR-BTC NG section closes in Oct 2015 hope it will open for BG traffic soon also within a yr or 2 but hope contractr will complete the work as soon as the block starts and till now contrctr work between JBP-NIR is satisfactory as all major bridges are ready and hope contractr will work on a fast pace after closure on JBP-NIR section and on NIR-BTC section also so that IR/SECR can open a shorter and much faster route for south from north and hope SECR will time to time check the work progress after closure so lets wait n see