Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Oct 22 17:40:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    109 Blog Entries  next>>
Info Update
418680 views
8

Feb 06 2022 (19:26)   SBT/Sabarmati Junction (3 PFs)
TouristerDivyanshu^~
TouristerDivyanshu^~   174639 blog posts
Entry# 5210819            Tags   Past Edits
#BulletTrain Updates (Ahmedabad - Mumbai Corridor)
MAHSR
Thread
Source- Multiple

NHSRCL
...
more...

Translate to English
Translate to Hindi

3 Public Posts - Sun Feb 06, 2022

7 Public Posts - Tue Feb 08, 2022

3 Public Posts - Mon Feb 14, 2022

1 Public Posts - Thu Feb 17, 2022

13 Public Posts - Fri Feb 18, 2022

2 Public Posts - Sat Feb 19, 2022

5 Public Posts - Sun Mar 13, 2022

4 Public Posts - Tue Mar 15, 2022

4 Public Posts - Mon Apr 04, 2022

13 Public Posts - Tue Apr 05, 2022

2 Public Posts - Fri Jul 22, 2022

1 Public Posts - Sun Jul 31, 2022

1 Public Posts - Sun Aug 21, 2022

4 Public Posts - Sat Sep 17, 2022

5 Public Posts - Tue Sep 20, 2022

39 Public Posts - Wed Sep 21, 2022

10567 views
0

Sep 22 2022 (02:53)
TouristerDivyanshu^~
TouristerDivyanshu^~   174639 blog posts
Re# 5210819-108              
Bullet Train Progress Report:

Physical Progress-21.3%
Completed Works in Gujarat
-176.4 km Pile Work
-88.56
...
more...
km Pier Work
-4.64 km Girders Launched

Work In Progress
-Well Foundation of bridges on major rivers
-8 Stations between Vapi-Sabarmati, under various construction stages

Translate to English
Translate to Hindi

1 Public Posts - Thu Sep 22, 2022

1 Public Posts - Sat Sep 24, 2022

5 Public Posts - Sun Sep 25, 2022

3 Public Posts - Mon Sep 26, 2022

6 Public Posts - Mon Oct 10, 2022

1 Public Posts - Tue Oct 11, 2022

10 Public Posts - Sat Dec 10, 2022

1 Public Posts - Tue Dec 27, 2022

1 Public Posts - Thu Dec 29, 2022

2 Public Posts - Wed Jan 25, 2023

1 Public Posts - Fri Jan 27, 2023
Info Update
2514 views
0

Sep 21 2022 (14:48)  
RailFansnehashish^~   28762 blog posts
Entry# 5482911              
Bullet Train Progress Report:

Physical Progress-21.3%
Completed Works in Gujarat
-176.4 km Pile Work
-88.56
...
more...
km Pier Work
-4.64 km Girders Launched

Work In Progress
-Well Foundation of bridges on major rivers
-8 Stations between Vapi-Sabarmati, under various construction stages

Translate to English
Translate to Hindi
Info Update
56980 views
5

Apr 25 2021 (10:49)   BEHS/Bihar Sharif Junction (5 PFs)
RohitBiharSharif~
RohitBiharSharif~   7566 blog posts
Entry# 4947043            Tags   Past Edits
The Current deadline for the completion is 31st of December, 2022 for
Bihar Sharif - Barbigha [BEHS - BRBGH] new rail line &
Neora - Daniyawan [NEO - DHWN] and Barbigha - Sheikhpura [BRBGH - SHK] new rail lines.

Source
...
more...

Translate to English
Translate to Hindi

4 Public Posts - Sun Apr 25, 2021

1793 views
1

Apr 25 2021 (11:04)
RohitBiharSharif~
RohitBiharSharif~   7566 blog posts
Re# 4947043-5              
BEHS SHK to march 2022 tak operational kar dena chahiye...as majority of works ho chuka hai...nhi to deadline se pehle kar hi dega.

Dec 2022 tak Neorà Jatdumri ban jaayega as kaam chal rha chhota sa section hai...but Jatdumri dhwn ka pata nhi... Google maps me to earthworks show ho rha hai..but uss area me small rivers streams kaafi hai...so late Karega ...that means whole SHK BEHS DHWN NEO line commissioning me 2024 Lok sabha election pahuncha dega for inaguration 😂😂😂
Translate to English
Translate to Hindi

6 Public Posts - Sun Apr 25, 2021
Info Update
17335 views
4

Dec 21 2020 (20:10)  
shailshekhara
shailshekhara   35275 blog posts
Entry# 4819382              
𝐃𝐞𝐥𝐡𝐢 – 𝐕𝐚𝐫𝐚𝐧𝐚𝐬𝐢 𝐇𝐢𝐠𝐡 𝐒𝐩𝐞𝐞𝐝 𝐑𝐚𝐢𝐥 – 𝐈𝐧𝐟𝐨𝐫𝐦𝐚𝐭𝐢𝐨𝐧, 𝐑𝐨𝐮𝐭𝐞 𝐌𝐚𝐩, 𝐅𝐚𝐫𝐞𝐬, 𝐓𝐞𝐧𝐝𝐞𝐫𝐬 & 𝐔𝐩𝐝𝐚𝐭𝐞𝐬

𝐈𝐧𝐟𝐨𝐫𝐦𝐚𝐭𝐢𝐨𝐧
Delhi – Varanasi High-Speed Rail (DVHSR Bullet Train) project is an 865 km proposed High Speed Rail line that will connect Delhi with Varanasi, Uttar Pradesh through 12 stations at an estimated cost of Rs. 1.21 lakh crore.
...
more...

The project’s feasibility report was prepared by INECO, TYPSA and ICT in 2017. Per the project’s feasibility report, riders will be able to travel between Delhi and Lucknow in 1 hour and 38 minutes, and between Delhi – Varanasi in 2 hours and 37 minutes.

In February 2020, the National High Speed Rail Corporation (NHSRCL) invited bids for preparing the line’s final alignment design, using LiDAR surveys, and for preparing Stage-1 preliminary route development artefacts, with an aim to prepare its detailed project report (DPR) as tasked by the Government of India in 2019. Contracts for these were awarded in August-end – see contract list at the bottom.

In March 2020, NHSRCL invited bids for environment (EIA) & social impact surveys (SIA), assessments, and utility identification along its proposed route. This line is part of the Diamond Quadrilateral project and will be extended in the future to Patna, Bihar and Kolkata, West Bengal.

𝐊𝐞𝐲 𝐅𝐢𝐠𝐮𝐫𝐞𝐬
▣ Operational: 0 km | Under Construction: 0 km | Proposed: 865 km

𝐒𝐲𝐬𝐭𝐞𝐦 𝐒𝐩𝐞𝐜𝐢𝐟𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬
▣ Maximum Speed: 350 kmph
▣ Operational Speed: 320 kmph
▣ Average Speed: 250 kmph
▣ Track Gauge: Standard Gauge – 1435mm
▣ Signalling: ETCS Level-2 of ERTMS
▣ Train Capacity: 750 passengers
▣ Traction: 25 KV AC overhead catenary (OHE)
▣ Safety: Urgent Earthquake Detection and Alarm System (UrEDAS) for automatic breaking in case of an earthquake

𝐃𝐞𝐥𝐡𝐢 – 𝐕𝐚𝐫𝐚𝐧𝐚𝐬𝐢 𝐇𝐒𝐑 𝐑𝐨𝐮𝐭𝐞 𝐈𝐧𝐟𝐨𝐫𝐦𝐚𝐭𝐢𝐨𝐧
▣ Length: 865 km
▣ Type: Elevated, Underground & At-Grade
▣ Number of Stations: 12
▣ Station Names: Delhi, Noida, Jewar Airport, Mathura, Agra, New Etawah, South Kannauj, Lucknow, Raibareli, Prayagraj (Allahabad), New Bhadoi, and Varanasi.

𝐃𝐞𝐥𝐡𝐢 – 𝐕𝐚𝐫𝐚𝐧𝐚𝐬𝐢 𝐇𝐒𝐑 𝐑𝐨𝐮𝐭𝐞 𝐌𝐚𝐩
Route Description: The proposed Delhi Varanasi High Speed Rail Corridor is planned to run along major expressways, national highways, greenfield areas, and may pass through arterial roads of the intermediate city road network for high speed rail connectivity between different cities along the corridor.
Alignment and location of stations displayed in Attached are purely indicative just to give an idea of how the line might look like.

𝐃𝐞𝐥𝐡𝐢 – 𝐕𝐚𝐫𝐚𝐧𝐚𝐬𝐢 𝐇𝐒𝐑 𝐅𝐚𝐫𝐞𝐬 (𝐏𝐫𝐢𝐜𝐞𝐬)
The fare structure is yet to be finalized but is expected to be 1.5 times the existing first class AC fare on the Indian Railways’ current service. The line’s official fare structure, prices and rules are expected to be finalized closer to the start of commercial operations.

Per the feasibility report, the line’s base fare is pegged at Rs. 4.5 per kilometer, so a ride from Delhi to Varanasi could cost approximately Rs. 3240 and approximately Rs. 1980 from Delhi to Lucknow.

𝐃𝐞𝐥𝐡𝐢 – 𝐕𝐚𝐫𝐚𝐧𝐚𝐬𝐢 𝐇𝐒𝐑 𝐓𝐞𝐧𝐝𝐞𝐫𝐬
Latest NHSRCL Delhi – Varanasi High Speed Rail tender notices can be viewed on NHSRCL’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.

𝐌𝐚𝐣𝐨𝐫 𝐂𝐨𝐧𝐭𝐫𝐚𝐜𝐭𝐨𝐫𝐬
▣ Data Collection and Associated Survey Work for DPR of Delhi-Varanasi HSR Corridor ▶ Ceinsys Tech Ltd.
▣ Final Alignment design including Aerial LiDAR survey and other related works ▶ Aarvee Associates Architects Engineers and Consultants – GSL Associates JV
▣ Preparation of General Arrangement Drawings (GADs) of Crossing Bridges over Rivers, Canals, Railways and Roads (Expressway, NH and SH and Major District Roads) and GADs of proposed Stations and Maintenance Depots ▶ Translink Infrastructure Consultants Pvt. Ltd.
▣ Environmental Impact Assessment Study / Field Work and Preparation of Environment Impact Assessment Report & Environment Management Plan ▶ Enviro Infra Solutions Pvt. Ltd.

Translate to English
Translate to Hindi

7 Public Posts - Mon Dec 21, 2020

2 Public Posts - Tue Dec 22, 2020

1 Public Posts - Wed Jan 06, 2021
Info Update
38709 views
17

★★
May 25 2019 (19:09)   BEHR/Beohari (3 PFs)
Ayan_Gautam~
Ayan_Gautam~   5747 blog posts
Entry# 4326055            Tags  
CRS inspection of katni beohari section and sone river bridge

#SingrauliNews
#KatniSingrauliElectrification
#KatniSingrauliDoubling
Translate to English
Translate to Hindi

4 Public Posts - Mon May 27, 2019

1 Public Posts - Tue May 28, 2019

5 Public Posts - Wed May 29, 2019

1 Public Posts - Thu May 30, 2019

1 Public Posts - Fri May 31, 2019

8912 views
0

May 31 2019 (23:53)
Ayan_Gautam~
Ayan_Gautam~   5747 blog posts
Re# 4326055-14              
Sone me abhi pillar nahi bana hai waise hi chhote bade aur rivers me bhi pillar banne me time lagega
Translate to English
Translate to Hindi

2 Public Posts - Sat Jun 01, 2019
Page#    109 Blog Entries  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy