Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Sep 13 22:10:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

08094/Bankura - Masagram MEMU Special
बांकुड़ा - मसाग्राम मेमू स्पेशल

BQA/Bankura Junction --> MSAE/Masagram

Latest News
(You need to double-check/verify this info yourself)
▪️Will be short terminated at Bowaichandi on 30.08.24
Fri Aug 30, 2024 (01:16PM)
News History
▪️ Cancelled on 22.06.24
Sat Jun 22, 2024 (12:19AM)
▪️ Cancelled on 26.02.23
Sat Feb 25, 2023 (01:27PM)
Due to Traffic-cum-Power Block in Bankura-Masagram section of Adra Division o­n 30.01.2022, 08094 Bankura – Masagram MEMU Special leaving Bankura o­n 30.01.2022 will short terminate at Bowaichandi.
Fri Jan 28, 2022 (03:31PM)
Coach Composition : MC - 2 & TC - 6. Total = 8 Coaches
Wed Nov 03, 2021 (10:57PM)
0 Follows
Bedroll/Linen: NOT Available
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Updated: Mar 01 (14:13) by AvradipTMZ^~
Dep:
Arr:
RSA - Rake Sharing
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    34 blog entries  next>>
General Travel
3893 views
0

Sep 06 (08:52)   08097/Mustaphachak - Bankura MEMU Special | MSAE/Masagram (5 PFs)
KamalMolla
KamalMolla   164 blog posts
Entry# 6180423            Tags  
Anyone know about the 5 KM Masagram flyover. Which side will make this flyover. Burdwan side or Howrah side and any Y link project work is there.

I mean already both line connection work done almost 95%. Then why this flyover. Maybe future preparation....!
Translate to English
Translate to Hindi
General Travel
7149 views
0

Aug 29 (16:39)   08094/Bankura - Masagram MEMU Special | RNGR/Rainagar (1 PFs)
KamalMolla
KamalMolla   164 blog posts
Entry# 6172295            Tags  
Anyone know about the Rainagar loop crossing line is complete or not.

Because today one stone wagen train passed through Rainagar-Masagram. Almost 40+ wagen. I think the train was for RNGR crossing loop line.
Translate to English
Translate to Hindi

4249 views
0

Aug 30 (13:41)
KamalMolla
KamalMolla   164 blog posts
Re# 6172295-1              
Today 08094 & 08097 short terminated and short originate from BWCN. Rainagar Crossing work is going full swing.
Translate to English
Translate to Hindi
General Travel
55785 views
3

Mar 01 (14:00)   08094/Bankura - Masagram MEMU Special | KMRL/Kumrul (1 PFs)
KamalMolla
KamalMolla   164 blog posts
Entry# 5983542            Tags  
Platform extension work started at Kumrul Station in Bankura Masagram Section.
150 feet platform will be increased in East side of the platform
Translate to English
Translate to Hindi

28392 views
2

Mar 08 (10:24)
KamalMolla
KamalMolla   164 blog posts
Re# 5983542-1              
KMRL/ Kumrul Platform Extension work
Translate to English
Translate to Hindi

24172 views
0

Mar 08 (10:43)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Re# 5983542-2              
The J-Gang Leader is forcing ER to destroy their best trains. Now even forcing ER to not to introduce new trains from places outside Godda. Pure Goondagiri being done. Now he is eyeing 12337/38, 12347/48, 13047/48 & 13187/88 for extension. On his goondagiri, HWH zone of ER failed to introduce
1. HWH-RPH Express via BWN-DGR-SURI, 2. RPH-NDAE MEMU via AMP-KWAE, 3. MLDT-RPH MEMU via NFK-JRLE-NHT, 4. ASN-MLDT Express via DGR-SURI, 5. ASN-NJP Expr. via DGR-BHP(using INCI-JTL-Guskara)
EZCC sincerely urged ER to introduce trains under 1, 4 & 5. Meanwhile 2 & 3 will
...
more...
solve connectivity problem between KWAE, AMP, NDAE, JRLE, RPH daily passengers. দুবেজি একটু বেশি ই বাড়াবাড়ি করছে। এবার শান্তিনিকেতন, সহিদ, মা তারা ও বিশ্বভারতী এক্সপ্রেসকেও গোড্ডা ও দেওঘর ওবধি প্রসারিত করার পরিকল্পনা করছে। মাসাগ্রাম-বাকুড়া লাইন এ এক্সপ্রেস ট্রেন দিতে পারছে না ই.আর. জোন এর ফলে। Masagram Linking of ER-SER will be completed before Pujo 2024

Translate to English
Translate to Hindi

24249 views
0

Mar 08 (13:53)
KamalMolla
KamalMolla   164 blog posts
Re# 5983542-3              
I don't know what Dubey ji want. But I think these all trains are not going godda.

Most probably this month Masagram connection work will be complete. 1-2 or NI work just remain to complete
Translate to English
Translate to Hindi

13836 views
0

May 20 (12:16)
belsukantagmail.com
belsukantagmail.com   58 blog posts
Re# 5983542-4              
What is the current news of Masagram connection?
Translate to English
Translate to Hindi
General Travel
69076 views
8

Mar 18 (10:55)   08094/Bankura - Masagram MEMU Special | MSAE/Masagram (5 PFs)
KamalMolla
KamalMolla   164 blog posts
Entry# 6002045            Tags  
2 compliments
Great Useful
Yesterday at Masagram. SER & ER Line Connection work status.

Most probably line connection work complete within few weeks.
Translate to English
Translate to Hindi

33771 views
3

Mar 25 (11:21)
KamalMolla
KamalMolla   164 blog posts
Re# 6002045-1              
2 compliments
Useful Great
Yesterday at Masagram
Translate to English
Translate to Hindi

22530 views
0

Mar 26 (19:03)
belsukantagmail.com
belsukantagmail.com   58 blog posts
Re# 6002045-2              
Howrah end er connection er kono pic. ache to din. Inter locking er kaj surur any news ?
Translate to English
Translate to Hindi

22330 views
0

Mar 27 (10:11)
KamalMolla
KamalMolla   164 blog posts
Re# 6002045-3               Past Edits
Work started.

You can see all about the work in tuis link

@click here
Translate to English
Translate to Hindi

20479 views
0

Mar 27 (14:10)
belsukantagmail.com
belsukantagmail.com   58 blog posts
Re# 6002045-4              
THANKS FOR INFORMATION.
Translate to English
Translate to Hindi

20872 views
1

Mar 27 (14:14)
jishnuthakur12301^~
jishnuthakur12301^~   9612 blog posts
Re# 6002045-5              
1 compliments
Agree
কাজ খুব দ্রুত এগোচ্ছে!!!!
Translate to English
Translate to Hindi
Info Update
67564 views
3

Oct 15 2023 (14:03)   08094/Bankura - Masagram MEMU Special | BQA/Bankura Junction (3 PFs)
sam25686roy
sam25686roy   214 blog posts
Entry# 5853328            Tags  
1 compliments
Great
Maximum Permissible Speed found is 95Kmph instead of earlier 80 Kmph.
Translate to English
Translate to Hindi

38772 views
0

Oct 29 2023 (19:20)
KamalMolla
KamalMolla   164 blog posts
Re# 5853328-1              
Bankura To Mathnashipur Maximum speed increase to 100 KM/H. And rest is 65 KM/H
Translate to English
Translate to Hindi
Page#    34 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy