Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sun Sep 15 14:58:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Medium; Side View; Small TB; Outside of Train;
Entry# 1635017-0
Small TB; Sleeper;
Entry# 4504579-0


13416/Patna - Malda Town Express
पटना - मालदा टाउन एक्सप्रेस

KIUL/Kiul Junction --> MLDT/Malda Town

Latest News
(You need to double-check/verify this info yourself)
• JCO 20.02.2023 will remain cancelled due to block for NI works related to doubling of Luckeesarai - Sheikhpura section over ECR.
Fri Feb 17, 2023 (07:00PM)
News History
▪️ Departure on 18.06.22 has been cancelled
Sat Jun 18, 2022 (11:45AM)
▪︎ दिनांक 19.08.2021 को स्पेशल एक्सप्रेस परिवर्तित मार्ग मोकामा - न्यू बरौनी - खगड़िया - कटिहार होकर जाएगी
Thu Aug 19, 2021 (08:04PM)
0 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Feb 27, 2009
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering only available at PNBE and RJPB.
Updated: Aug 13 (09:46) by guest
Dep:
Arr:
RSA - Rake Sharing
No RSA; Single Utkrisht Rake; PM@MLDT
Rating: 4.4/5 (23 votes)
cleanliness - excellent (4)
punctuality - excellent (4)
food - good (3)
ticket avbl - average (4)
u/r coach - excellent (3)
railfanning - excellent (4)
safety - excellent (4)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
S10
  5
 S9
  6
 S8
  7
 S7
  8
 S6
  9
 S5
 10
 S4
 11
 S3
 12
 S2
 13
 S1
 14
 A1
 15
 B2
 16
 B1
 17
GEN
 18
GEN
 19
GEN
 20
GEN
 21
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    61 blog entries  <<prev  next>>
1 Followers
General Travel
202911 views
18

★★★
Jul 12 2018 (21:02)   13416/Patna - Malda Town Express | SBG/Sahibganj (3 PFs)
SBGLoop~
SBGLoop~   620 blog posts
Entry# 3623937            Tags   Past Edits
Electrification Update from Bonidanga to Sahibganj:
Digging of holes have begun and has reached Karanpurato. However, no signs of electrification can be seen at the station circulating area. Meanwhile, a quite monsoonic Rajmahal hills drew my attention.
Translate to English
Translate to Hindi

16 Posts

39750 views
0

Apr 26 2019 (21:45)
mazhar.nfr~
mazhar.nfr~   1896 blog posts
Re# 3623937-17              
If u have video, plz upload.
Tinpahar-Sahibganj target june/19. Complete hoga kiya ?
Translate to English
Translate to Hindi

41568 views
0

Apr 26 2019 (23:25)
HARSHR.^~
HARSHR.^~   6408 blog posts
Re# 3623937-18              
Bgp Sbg is pending due to Ni work...After Ni work Bgp Sbg Electrification will also start And i hope ki Entire (Kiul-Bgp-Sbg-Bhw) Section March 2020 Tk complete ho jye btw What is the status of Tph-Rajmahal Electrification status??
Translate to English
Translate to Hindi

42626 views
0

Apr 27 2019 (03:50)
SBGLoop~
SBGLoop~   620 blog posts
Re# 3623937-19              
Sorry Sir, I donot have the video.June 2019 target may not be achieved as no work has started at SBG Station. Moreover, the old foot over bridge has to be demolished for height issues of OHE.
Translate to English
Translate to Hindi

43236 views
1

Apr 27 2019 (03:53)
SBGLoop~
SBGLoop~   620 blog posts
Re# 3623937-20              
Haven't been to be the TPH-RJL section. So cannot comment on the same.
Translate to English
Translate to Hindi

40619 views
0

Apr 29 2019 (15:16)
AmishKumar^~
AmishKumar^~   12539 blog posts
Re# 3623937-21              
CRS already done upto Tph.
Translate to English
Translate to Hindi
Info Update
65918 views
5

Aug 31 2018 (19:29)   13031/Howrah - Jaynagar Express | JMP/Jamalpur Junction (4 PFs)
SAPTARSHI^~
SAPTARSHI^~   26764 blog posts
Entry# 3766981            Tags   Past Edits
Cancellation Notice
Translate to English
Translate to Hindi

More Posts
General Travel
653460 views
4

Apr 07 2019 (20:58)   13153-Slip/Sealdah - Balurghat Gour Link Express (PT) | MLDT/Malda Town (7 PFs)
SandipMadhu^~
SandipMadhu^~   847 blog posts
Entry# 4284167            Tags   Past Edits
MALDA TOWN
Station Full View
Watcth Now-click here
Don't Miss Watch full
...
more...

Translate to English
Translate to Hindi
Info Update
123794 views
6

Jan 12 2019 (20:29)   12367/Vikramshila Express (PT) | BGP/Bhagalpur Junction (6 PFs)
Railadventures~
Railadventures~   2772 blog posts
Entry# 4195057            Tags   Past Edits
Majority of hookes has been set up today, might be in another 2 days all Hookes of platform will be setup.3 more platform connecting poles to set.

2 key thing is yet to happen before completion of electrification of Bhagalpur:-
#Digging holes and fixing poles towards Kahalgaon side till the end of yard side crossing bolanathpul work is under progress
...
more...
#Dismantling of low height FOB at mid of BhagalpurJn.
#Update:- Loco will be changed at BhagalpurJn for train passing through this route.
#Doubling- Linking of double line track till LMM is yet to be aligned at BhagalpurJn.Non interlocking under progress.
***Further LMM to ghogha 6km work also completed and trail has been conducted with light engine.CRS of LMM to Kahalgaon timeline was January 19. Hopefully not January but definitely by March CRS will happen.

Translate to English
Translate to Hindi

More Posts
General Travel
37246 views
0

Jan 10 2019 (21:12)   13235/Sahibganj - Danapur InterCity Express | SBG/Sahibganj (3 PFs)
Railadventures~
Railadventures~   2772 blog posts
Entry# 4193287            Tags   Past Edits
Anyone living in Kahalgaon-Sahibganj-Bhararwa kindly tell about progress of electrification in this section which as per electrification core in currently under progress.
Translate to English
Translate to Hindi
Page#    61 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy