|
Post PNR | Post Blog | Advanced Search |
2 Follows Bedroll/Linen: AVAILABLE change Inaugural Run Tue Dec 22, 2009 Pantry/Catering ✕ Pantry Car ✕ On-board Catering ✓ E-Catering | Updated: Sep 27 (22:09) by JayShah^~
RSA - Rake Sharing No RSA. Primary maintenance at MMCT. Secondary Maintenance at HAPA. | Rating: 3.8/5 (91 votes) cleanliness - good (18) punctuality - good (17) food - good (10) ticket avbl - good (16) railfanning - good (15) safety - good (15) | ||||
LHB Rake Rake/Coach Position 0 L 1 EOG 2 M1 3 M2 4 M3 5 M4 6 B1 7 B2 8 B3 9 B4 10 B5 11 B6 12 A1 13 A2 14 A3 15 H1 16 DL1 |
This is the Shortest Route between Ahmedabad Jn and Hapa. | ||||||||||||||||
Travel Time: 5h 40m 2 halts Distance: 323 km Avg Speed: 57 km/hr | ||||||||||||||||
Max Permissible Speed: 130 km/hr between DRD/Dahanu Road and VTA/Vatva | ||||||||||||||||
Type: Duronto Rake Zone: WR/Western | Departs @ 05:00 Platform# 1
| Arrives @ 10:40 Platform# 1
|