Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Tue Sep 3 07:45:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

RAU/Rau (2 PFs)
राऊ
راؤ

Track: Double Electric-Line

Updated: Oct 26 2023 (09:24) by Padmakant
Rau railway station, located in the heart of Rau, Indore, Madhya Pradesh, is a bustling junction serving the local area. It offers basic amenities like waiting rooms and restrooms. The station is known for its historic significance, having played a key role in the development of the region's transportation network.

Tourism

Shri Radha Krishna Mandir: A revered Hindu temple dedicated to Radha Krishna.
Jain Temple: A peaceful Jain temple with intricate carvings.
Masjid-e-Rahmania: A prominent mosque known for its architectural beauty.
Shri Hanuman Mandir: A temple dedicated to Hanuman, known for its spiritual significance.
Durga Mandir: A temple dedicated to Goddess Durga, frequented by devotees.

Food

Shree Krishna Restaurant: Known for its delicious vegetarian thalis and snacks.
Aahar: A popular vegetarian eatery offering a wide variety of dishes.
Sagar Restaurant: A traditional vegetarian restaurant serving home-style meals.
Jain Bhojanalaya: Specializes in Jain vegetarian cuisine.
The Dhaba: A roadside eatery offering tasty vegetarian street food.

Station Address

Rau, Indore. Pincode - 453331
State: Madhya Pradesh

Elevation: 585 m above sea level
Type: Junction   Category: NSG-6
Zone: WR/Western   Division: Ratlam


No Recent News for RAU/Rau
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 14
Number of Originating Trains: 0
Number of Terminating Trains: 0
1 Follows
Rating: 3.4/5 (8 votes)
cleanliness - average (1)
porters/escalators - average (1)
food - average (1)
transportation - excellent (1)
lodging - average (1)
railfanning - average (1)
sightseeing - excellent (1)
safety - excellent (1)

Station News

Page#    Showing 1 to 20 of 51 News Items  next>>
Aug 05 (17:05) Indore MP Pushes for 4 More Stations to be Included in Amrit Bharat Station Scheme (www.naidunia.com)
IR Affairs
WR/Western
21208 views
0

News Entry# 563664   
  Past Edits
Aug 05 2024 (17:05)
Station Tag: Mangliyagaon/MGG added by AdittyaaSharma^~/1421836

Aug 05 2024 (17:05)
Station Tag: Rajendra Nagar/RJQ added by AdittyaaSharma^~/1421836

Aug 05 2024 (17:05)
Station Tag: Fatehabad Chandrawatiganj Junction/FTD added by AdittyaaSharma^~/1421836

Aug 05 2024 (17:05)
Station Tag: Rau/RAU added by AdittyaaSharma^~/1421836

Aug 05 2024 (17:05)
Station Tag: Ratlam Junction/RTM added by AdittyaaSharma^~/1421836

Aug 05 2024 (17:05)
Station Tag: Indore Junction/INDB added by AdittyaaSharma^~/1421836
read full article... इंदौर के आस-पास छोटे रेलवे स्टेशनों की ‘अमृत’ से बदलेगी सूरत, सांसद शंकर लालवानी ने रेलमंत्री से की मुलाकात

The Indian Railways' Amrit Bharat Station scheme aims to modernize railway stations across the country. Under this scheme, 16 stations in the Ratlam division are being upgraded, with most projects already underway. Indore MP Shankar Lalwani has requested that four stations near Indore - Rau, Mangliya, Rajendra Nagar, and Chandrawatiganj...
more...
(Fatehabad) - be included in the scheme. These stations will receive improvements similar to airports, including modernized circulating areas, improved station buildings, roof plazas, modern entrances, waiting halls, retiring rooms, restroom facilities, executive lounges, signage, kiosks, station access roads, landscaping, additional entrances, platform covers, drainage systems, Wi-Fi access, escalators, CCTV cameras, and more. Indore Junction is also being redeveloped under the scheme, with a virtual groundbreaking ceremony conducted by Prime Minister Narendra Modi in February. The 479 crore rupee project is expected to be completed by 2027 and will provide airport-style amenities. The project includes the construction of a seven-story building on platform 1 and a three-story building on platform 4, featuring hotels, shopping complexes, and other amenities. A basement parking facility and an AC booking hall for 1000 passengers will also be built. Tenders for the project were opened on July 2, with 18 agencies participating. After the tender process, approvals, and preparation for train operations, construction is expected to begin in November or December.

India ka Railway Amrit Bharat Station Yojana se desh ke sabhi railway station ko modernise karna chahta hai. Is Yojana ke neeche Ratlam division me 16 station upgrade kiye ja rahe hai, aur zyadatar project pehle se hi start ho chuke hai. Indore ke MP Shankar Lalwani ne request ki hai...
more...
ki Indore ke paas ke four station - Rau, Mangliya, Rajendra Nagar, aur Chandrawatiganj (Fatehabad) - ko bhi is Yojana me include kiya jaye. In stations ko airport jaise improvement milega, jaise modernise circulating area, improve station buildings, roof plaza, modern entrance, waiting hall, retiring room, restroom facilities, executive lounge, signage, kiosk, station access road, landscaping, additional entrance, platform covers, drainage systems, Wi-Fi access, escalator, CCTV camera, aur aur bhi kai facilities. Indore Junction ko bhi is Yojana ke neeche redevelop kiya ja raha hai, jiska virtual groundbreaking ceremony Prime Minister Narendra Modi ne February me kiya tha. 479 crore rupee ka ye project 2027 tak complete hone ki umeed hai aur isme airport jaise facilities provide ki jayengi. Project me platform 1 pe 7-storey building aur platform 4 pe 3-storey building banaye ja rahe hai, jisme hotel, shopping complex, aur aur bhi facilities honge. Basement parking facility aur 1000 passengers ke liye AC booking hall bhi banaye ja rahe hai. Project ke liye tender 2 July ko open kiye gaye the, jisme 18 agencies ne hissa liya tha. Tender process, approval, aur train operation ke liye preparation ke baad, November ya December me construction start hone ki umeed hai.
May 31 (19:56) Speed Trial Conducted for Double-Tracked Section between Rau and Mhow (www.bhaskar.com)
IR Affairs
WR/Western
9877 views
0

News Entry# 554277   
  Past Edits
May 31 2024 (19:56)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by Exynos9611~/2099623

May 31 2024 (19:56)
Station Tag: Rau/RAU added by Exynos9611~/2099623
read full article... राऊ-महू रेल दोहरीकरण ट्रैक का स्पीड ट्रायल..:130 किमी की रफ्तार से चली ट्रेन, 9.5 किमी की दूरी 9 मिनट में तय की

On Thursday, a speed trial was conducted for the double-tracked section between Rau and Mhow, covering a distance of 9.5 kilometers. Railway officials inspected the newly constructed track and bridges using a trolley for eight hours. Later that night, a speed trial with a train was conducted at 130 kilometers per...
more...
hour. The double-tracking project will eliminate crossing issues and allow for more long-distance express trains to run through Mhow. Previously, trains had to be stopped at stations due to crossing conflicts.

Rau aur Mhow ke beech 9.5 kilometer ke hisse mein double-tracked section ka speed trial Thursday ko hua. CRS inspection ke pehle aath ghanto mein railway ke officers ne trolley ke zariye newly constructed track, pul-puliyaon ki jaanch ki. Fir raat mein newly constructed track per 130 km per hour speed...
more...
trial kiya gaya. Double-tracking ka fayda yeh hoga ki crossing ki problem khatam ho jayegi aur Mhow mein lambi doori ki express trains ki sankhya badhegi. Pehle trains ko station per rokna padta tha.
May 30 (22:26) Railway Safety Commissioner Inspects Newly Doubled Track Between Rau and Mhow, Conducts High-Speed Test Run (www.naidunia.com)
IR Affairs
WR/Western
19230 views
3

News Entry# 554203   
  Past Edits
May 30 2024 (22:26)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

May 30 2024 (22:26)
Station Tag: Rau/RAU added by AdittyaaSharma^~/1421836
read full article... Railway News: 130 किमी प्रतिघंटे की रफ्तार से 9 मिनट में तय किया राऊ-महू स्टेशन का 9.5 किमी का मार्ग

On Thursday, May 30th, the Commissioner of Railway Safety (CRS) for the Western Circle, Mumbai, R.K. Sharma, inspected the newly completed doubling work between Rau and Dr. Ambedkar Nagar (Mhow) railway stations. The inspection included a test run of a train at a speed of 130 km/h, covering the 9.5 km...
more...
distance in just 9 minutes. The CRS inspected the entire track, new buildings at Harniyakhedi and Mhow stations, platforms, and tracks. A 15-day mega block at Mhow station was enforced from May 15th to May 30th to complete the doubling work. The DEMU train service from platform number 1 at Mhow station is expected to start on June 1st or 2nd. The inspection also included the examination of 10 bridges and culverts along the 9.5 km stretch. The CRS inspected the facilities for disabled passengers at Harniyakhedi station and checked the lighting. At Mhow station, he inspected platforms 1-4, lighting, toilets, loco pilot rooms, guard rooms, TTE rooms, waiting rooms, announcement rooms, tracks, foot over bridge, station building, and other aspects. After the station inspection, a train with 8 coaches and 2 engines was used to inspect the track at normal speed. The CRS left Rau station at 7:44 PM for Mhow station, where the train arrived at 7:53 PM after covering the 9.5 km distance at a speed of 130 km/h.

Thursday, May 30th ko, Mumbai ke Western Circle ke Commissioner of Railway Safety (CRS), R.K. Sharma ne Rau aur Dr. Ambedkar Nagar (Mhow) railway stations ke beech mein hua doubling work ka inspection kiya. Is inspection mein 130 km/h ki speed se ek train ka test run bhi shamil tha, jisse...
more...
9.5 km ka safar sirf 9 minutes mein pura hua. CRS ne pura track, Harniyakhedi aur Mhow stations par bane naye building, platforms, aur tracks ka bhi inspection kiya. Doubling work ko complete karne ke liye Mhow station par 15 din ka mega block May 15th se May 30th tak laga tha. Mhow station ke platform number 1 se DEMU train service June 1st ya 2nd se start hone ki ummid hai. Inspection mein 9.5 km ke beech mein aane wale 10 bridges aur culverts ki jaanch bhi ki gayi. CRS ne Harniyakhedi station par disabled passengers ke liye facilities ka inspection kiya aur lighting bhi check ki. Mhow station par unhone platforms 1-4, lighting, toilets, loco pilot rooms, guard rooms, TTE rooms, waiting rooms, announcement rooms, tracks, foot over bridge, station building, aur doosre aspects ka bhi inspection kiya. Station ka inspection hone ke baad, 8 coaches aur 2 engines wali ek train se normal speed par track ka inspection kiya gaya. CRS Rau station se 7:44 PM par Mhow station ke liye nikle aur 130 km/h ki speed se train chalate hue 9.5 km ka safar 9 minutes mein pura karke 7:53 PM par Mhow station ke platform number 2 par pahunche.
May 29 (19:39) Indian Railways Completes Double-Tracking Project Between Mhow and Rau, Speed Trial Underway (www.bhaskar.com)
IR Affairs
WR/Western
10370 views
0

News Entry# 554049   
  Past Edits
May 29 2024 (19:39)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by Exynos9611~/2099623

May 29 2024 (19:39)
Station Tag: Rau/RAU added by Exynos9611~/2099623
read full article... महू-राऊ रेलवे लाइन का दोहरीकरण कार्य पूरा:नए ट्रैक पर 130 किमी. की स्पीड से दौड़ा इंजन

Indian Railways has completed the 9.5 km double-tracking project between Mhow and Rau stations in Dr. Ambedkar Nagar. The new railway track is currently undergoing a safety inspection by the Commissioner of Railway Safety (CRS), which will last until May 30. This inspection involves a trolley inspection of the entire track...
more...
followed by a speed trial using an inspection engine at 130 km per hour. To ensure safety during the speed trial, the railway is taking precautions including announcements and additional security measures at railway crossings. The project, which began last year, included a large bridge at Kishanganj. The railway implemented a mega-block at Mhow station for 15 days to expedite the project, during which passenger trains were not operational.

Indian Railways ne Dr. Ambedkar Nagar ke Mhow station se Rau station tak 9.5 km ka double-tracking ka kaam pura kar liya hai. May 29 aur 30 tak, CRS (Commissioner of Railway Safety) by new track ka inspection kar raha hai. Isme, trolley se pure track ka inspection aur...
more...
130 km per hour speed se inspection engine chalake speed trial bhi ho raha hai. Speed trial ke liye, railway safety measures le raha hai, jaise announcements aur railway crossings par extra security. Last year se chalne wala project, Kishanganj mein bada bridge bhi include karta hai. Project ko jaldi karne ke liye, railway ne Mhow station par 15 din ke liye mega-block lagaya, jisme passenger trains nahi chali.
May 29 (11:12) New Railway Line Near Indore Undergoes Safety Inspections and Speed Trials (www.naidunia.com)
IR Affairs
WR/Western
16894 views
0

News Entry# 553985   
  Past Edits
May 29 2024 (11:12)
Station Tag: Indore Junction/INDB added by AdittyaaSharma^~/1421836

May 29 2024 (11:12)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

May 29 2024 (11:12)
Station Tag: Rau/RAU added by AdittyaaSharma^~/1421836
read full article... Rau Mhow Railway Section: इंदौर में रेलवे करवा रहा प्रचार, 130 किमी की रफ्तार से चलेगी ट्रेन, राऊ-महू रेलखंड से रहें दूर

A new 9.5 km long railway line between Rau and Mhow near Indore is complete and undergoing safety checks. The Railway Safety Commissioner, Western Circle, will inspect the line on May 30th, with speed trials conducted between 9 am and 9 pm. The inspection will include a check of the...
more...
track, bridges, approaches, and the speed of motor trolleys between intermediate stations. The line will be tested at 130 km/h to assess its capacity. The railway administration has issued notices to avoid the area during inspections on May 29th and 30th, advising people to stay away from the railway tracks and exercise caution when crossing unmanned level crossings. Public awareness campaigns are being conducted through auto rickshaws.

Indore ke paas Rau aur Mhow ke beech ek nayi 9.5 km lambi railway line ban kar tayyar ho gayi hai. Is line pe safety check ho raha hai. Railway Safety Commissioner, Western Circle, 30 May ko is line ka inspection karenge, aur 9 am se 9 pm tak speed trials...
more...
bhi honge. Inspection mein track, bridges, approaches, aur intermediate stations ke beech motor trolleys ki speed ki check bhi hogi. Is line ki capacity check karne ke liye 130 km/h ki speed se test kiya jaayega. Railway administration ne 29 aur 30 May ko inspection ke dauran is area se door rahene ka notice jaari kiya hai. Logon ko railway track se door rahene aur unmanned level crossings par dhyan rakhne ka bhi kaha gaya hai. Public awareness campaigns auto rickshaw ke through ki jaa rahi hain.
Page#    Showing 1 to 20 of 51 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy