Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 09:51:50 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

SINA/Srinagar Kashmir (3 PFs)
श्रीनगर कश्मीर
شری نگر کشمیر

Track: Single Electric-Line

Updated: Dec 18 2022 (21:58)
Srinagar Railway Station (SINA) is the primary railhead in Srinagar, Kashmir. Located off NH-1A on Station Link Road, Bagati Kanipora, it serves as a vital transportation hub connecting the city to other parts of India. Passengers can find basic amenities like waiting rooms, refreshment stalls, and restrooms at the station.

Tourism

**Hazratbal Shrine:** A revered Islamic shrine dedicated to a relic of the Prophet Muhammad.
**Shankaracharya Temple:** An ancient Hindu temple perched atop a hill overlooking Srinagar.
**Jama Masjid:** A grand mosque known for its intricate architecture and historical significance.
**Kheer Bhawani Temple:** A Hindu temple dedicated to the goddess Ragnya Devi.
**Pari Mahal:** A historical palace turned into a garden, offering scenic views of the city.

Food

**Vaishno Dhaba:** Popular for its authentic Kashmiri vegetarian dishes.
**The Curry House:** Offers a wide variety of North Indian and Chinese vegetarian options.
**Amritsari Kulcha:** Known for its delicious and freshly baked Kulchas.
**Cafe Kahwa:** A cozy cafe serving a range of vegetarian snacks and beverages.
**The Vegetarian Kitchen:** Offers a diverse menu of vegetarian meals and snacks.

Station Address

Off NH-1A, Station Link Road, Bagati Kanipora, Srinagar Pin - 190015
State: Jammu and Kashmir

Elevation: 1583 m above sea level
Type: Regular   Category: NSG-6
Zone: NR/Northern   Division: Firozpur


No Recent News for SINA/Srinagar Kashmir
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 17
Number of Originating Trains: 0
Number of Terminating Trains: 0
2 Follows
Rating: 4.3/5 (46 votes)
cleanliness - excellent (6)
porters/escalators - good (5)
food - average (5)
transportation - excellent (6)
lodging - good (6)
railfanning - good (6)
sightseeing - excellent (6)
safety - excellent (6)

Station News

Page#    Showing 21 to 40 of 305 News Items  <<prev  next>>
Jul 04 (22:26) World's Highest Railway Bridge Opens, Connecting Kashmir to India by Rail (hindi.news18.com)
IR Affairs
NR/Northern
32008 views
0

News Entry# 558960   
  Past Edits
Jul 04 2024 (22:26)
Station Tag: Taherpur/THP removed by Adittyaa Sharma/1421836

Jul 04 2024 (22:26)
Station Tag: MCTM Udhampur/MCTM removed by Adittyaa Sharma/1421836

Jul 04 2024 (22:26)
Station Tag: MCTM Udhampur/MCTM added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Taherpur/THP added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Udhampur/UHP added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Baramula/BRML added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Sangaldan/SGDN added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: SMVD Katra/SVDK added by AdittyaaSharma^~/1421836

Jul 04 2024 (22:26)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836
read full article... चिनाब ब्रिज से आप भी जल्‍द कर सकेंगे ट्रेन से सफर, लेकिन कटड़ा से श्रीनगर तक के लिए करना होगा इंतजार

The Reasi-Sangaldan section of the Udhampur-Srinagar-Baramula Rail Link (USBRL) project, which includes the world's highest railway bridge, the Chenab Bridge, has received clearance from the Commissioner of Railway Safety (CRS). This means that trains can now run on this section. However, the complete journey from Katra to Srinagar by train is...
more...
not yet possible as the Katra-Sangaldan section is still under construction. Once this section is completed, Kashmir will be connected to the rest of India by rail, allowing passengers to travel from Kanyakumari to Kashmir by train. The USBRL project is a challenging undertaking, spanning 272 km and involving 38 tunnels and 927 bridges, including the iconic Chenab Bridge, which is considered the world's highest railway arch bridge.

Udhampur-Srinagar-Baramula Rail Link (USBRL) project mein, Reasi se Sangaldan section, jismein world ka sabse uncha railway bridge, Chenab Bridge hai, ko Commissioner of Railway Safety (CRS) se clearance mil gaya hai. Iska matlab hai ki ab is section pe trains chal sakti hain. Par Katra se Srinagar tak train se pura...
more...
journey abhi nahin possible hai kyunki Katra-Sangaldan section abhi ban raha hai. Jab yeh section ban jaayega, toh Kashmir rail se desh ke baaki hisso se connect ho jaayega, jisse passengers Kanyakumari se Kashmir tak train se travel kar sakenge. USBRL project bahut challenging hai, yeh 272 km lamba hai aur ismein 38 tunnels aur 927 bridges hain, jismein iconic Chenab Bridge bhi hai, jisko world ka sabse uncha railway arch bridge maana jaata hai.
Jul 03 (23:28) Kashmir Railway Link Nears Completion, New Vande Bharat Train to Connect Srinagar and Kanyakumari (railjournal.in)
New/Special Trains
NR/Northern
18321 views
0

News Entry# 558808   
  Past Edits
Jul 03 2024 (23:28)
Station Tag: Kanniyakumari/CAPE added by AdittyaaSharma^~/1421836

Jul 03 2024 (23:28)
Station Tag: SMVD Katra/SVDK added by AdittyaaSharma^~/1421836

Jul 03 2024 (23:28)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836
read full article... New Vande Bharat and train to Kanyakumari for Sri Nagar as Kashmir railway link project gears up for completion

The Kashmir railway link project is nearing completion. This is indicated by the addition of station tags for Kanniyakumari (CAPE), SMVD Katra (SVDK) and Srinagar Kashmir (SINA) on July 3, 2024. The project will see the introduction of a new Vande Bharat train running between Srinagar and Kanyakumari.

Kashmir railway link project abhi poora hone wala hai. July 3, 2024 pe Kanniyakumari (CAPE), SMVD Katra (SVDK) aur Srinagar Kashmir (SINA) ke station tags add ho gaye hain. Is project mein Srinagar aur Kanyakumari ke beech ek naya Vande Bharat train chalaaya jaayega.
Jun 22 (23:16) Sangaldan-Reasi Rail Link to Become Operational by Month End in Jammu and Kashmir (www.daijiworld.com)
IR Affairs
NR/Northern
33813 views
0

News Entry# 557328   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... Latest National / World J&K: Sangaldan-Reasi rail link to become operational by month end

The Sangaldan-Reasi rail link in Jammu and Kashmir is set to be operational by the end of June. The final inspection of the line, including the world's highest railway bridge over the Chenab River, is scheduled for later this month. Regular train services will begin from Baramulla to Reasi by the...
more...
end of June or the first week of July. A 17 km section from Reasi to Katra will be operational within six months. The 46 km Reasi-Sangaldan section, which features the Chenab Bridge, has already been tested with a MEMU train. The bridge stands at an impressive height of 359 meters, surpassing the Eiffel Tower. The USBRL project, spanning 272 km, has already seen 209 km commissioned in phases since 2009. Once the Reasi-Katra section is operational, Kashmir will be connected by rail to the rest of India. This project, which began in 1997, passes through challenging terrain and is a monumental achievement in engineering.

Jammu and Kashmir mein Sangaldan-Reasi rail link June ke end tak operational ho jaayega. Chenab River pe world's highest railway bridge ke saath, Sangaldan-Reasi section ka final inspection is month ke end mein hoga. Baramulla se Reasi tak regular train service June ke end ya July ke first week mein start...
more...
ho jaayega. Reasi se Katra tak 17 km ka section next six months mein operational ho jaayega. 46 km ka Reasi-Sangaldan section, jismein Chenab Bridge bhi hai, pehle hi MEMU train se test kiya ja chuka hai. Bridge Eiffel Tower se bhi zyada 359 meters ki height pe hai. 272 km ki USBRL project mein 209 km ka part 2009 se chala aaya hai. Reasi-Katra section operational hone ke baad, Kashmir Valley rest of India se rail link se connect ho jaayega. 1997 mein shuru hui yeh project, difficult terrain se hoke guzarta hai aur engineering mein ek bada achievement hai.
Jun 22 (06:17) World's Highest Railway Bridge Trial Run Completed in Jammu and Kashmir: Train Service to Start Soon (www.thehindu.com)
Commentary/Human Interest
NR/Northern
24491 views
0

News Entry# 557179   
  Past Edits
Jun 22 2024 (06:18)
Station Tag: Baramula/BRML added by SmallTownTraveller^~/1084688

Jun 22 2024 (06:17)
Station Tag: Srinagar Kashmir/SINA added by SmallTownTraveller^~/1084688

Jun 22 2024 (06:17)
Station Tag: SMVD Katra/SVDK added by SmallTownTraveller^~/1084688

Jun 22 2024 (06:17)
Station Tag: Reasi/REASI added by SmallTownTraveller^~/1084688

Jun 22 2024 (06:17)
Station Tag: Sangaldan/SGDN added by SmallTownTraveller^~/1084688
read full article... Railways conducts trial run on world's highest arch rail bridge in J&K

On June 20, 2024, Indian Railways successfully conducted a trial run of an eight-coach MEMU train on the Chenab Bridge, the world's highest railway bridge, located in Jammu and Kashmir. The trial run covered a 46-km-long electrified line between Sangaldan and Reasi, passing through nine tunnels, including the 11.13 km long...
more...
T-44 tunnel. The trial run marks a significant milestone in the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, aiming to connect the Kashmir valley with the Indian rail network. The project involves 38 tunnels, 927 bridges, and the iconic Chenab Bridge, which is the world's highest arch railway bridge. The train service is expected to commence by the end of June 2024, facilitating easier movement of people and goods, promoting cultural exchanges, and boosting economic activities in the region.

20 June 2024 ko, Indian Railways ne duniya ke sabse unche railway bridge - Chenab Bridge pe ek eight-coach MEMU train ka trial run successfully kiya. Ye trial run Sangaldan aur Reasi ke beech 46 km long electrified line pe hua, jisme 9 tunnels bhi hain, jisme 11.13 km lamba T-44...
more...
tunnel bhi hai. Ye trial run Udhampur-Srinagar-Baramulla Rail Link (USBRL) project ke liye ek bada milestone hai, jiska aim Kashmir valley ko Indian rail network se connect karna hai. Is project mein 38 tunnels, 927 bridges aur iconic Chenab Bridge bhi hai, jo duniya ka sabse uncha arch railway bridge hai. Train service June 2024 ke end tak shuru hone ki ummeed hai, jisse logon aur saamaan ki aasaan movement ho sakegi, cultural exchange promote hoga, aur region mein economic activities boost honge.
Jun 18 (10:48) Engine Arrives at Reasi Station, Signalling Imminent Train Operations on USBRL's Highest Railway Bridge (www.amarujala.com)
IR Affairs
NR/Northern
32776 views
1

News Entry# 556618   
  Past Edits
Jun 18 2024 (10:48)
Station Tag: Srinagar Kashmir/SINA added by SmallTownTraveller^~/1084688

Jun 18 2024 (10:48)
Station Tag: Jammu Tawi/JAT added by SmallTownTraveller^~/1084688

Jun 18 2024 (10:48)
Station Tag: Udhampur/UHP added by SmallTownTraveller^~/1084688

Jun 18 2024 (10:48)
Station Tag: SMVD Katra/SVDK added by SmallTownTraveller^~/1084688

Jun 18 2024 (10:48)
Station Tag: Reasi/REASI added by SmallTownTraveller^~/1084688

Jun 18 2024 (10:48)
Station Tag: Sangaldan/SGDN added by SmallTownTraveller^~/1084688
read full article... Train To Kashmir: जल्द ट्रेन से पहुंच पाएंगे कश्मीर, संगलदान-रियासी ट्रैक पर दौड़ा इंजन, 30 को पहली ट्रेन

An engine arrived at the Reasi railway station on June 18, 2024, marking a significant milestone for the Udhampur-Srinagar-Baramula Rail Link (USBRL) project. The engine's arrival signals the imminent commencement of train operations on the newly constructed 46 km Sangaldan-Reasi track. The track features the world's highest railway bridge. The Commissioner...
more...
of Railway Safety (CRS) is scheduled to inspect the track on June 27-28, after which the first train is expected to run on June 30. The 272 km USBRL project is being implemented in two phases, with the first 118 km Kazigund-Baramula section inaugurated in October 2009.

Reasi railway station pe 18 June 2024 ko ek engine pahuncha, yeh Udhampur-Srinagar-Baramula Rail Link (USBRL) project ke liye ek bada step hai. Is engine ke aane se 46 km lamba Sangaldan-Reasi track pe train chalaane ka rasta khul gaya hai. Is track pe dunia ka sabse uncha railway bridge bhi...
more...
hai. 27-28 June ko Commissioner of Railway Safety (CRS) is track ka inspection karenge, aur phir 30 June ko pehli train chalaane ki ummid hai. 272 km lamba USBRL project do phases mein ban raha hai, aur pehla 118 km Kazigund-Baramula section October 2009 mein khula tha.

Rail News
28449 views
1

Jun 18 (17:19)
SGRFC^~
SGRFC^~   2707 blog posts
Re# 6098806-1              
Great
Translate to English
Translate to Hindi
Page#    Showing 21 to 40 of 305 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy