Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Mon Sep 16 19:43:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

SWD/Sanawad (3 PFs)
सनावद
سناود

Track: Construction - Single-Line Electrification

Station Address

SH 27, Sanawad, District - West Nimar (Khargone), Pin 451111
State: Madhya Pradesh

Elevation: n/a
Type: Regular   Category: n/a
Zone: WR/Western   Division: Ratlam


No Recent News for SWD/Sanawad
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 1
Number of Terminating Trains: 1
0 Follows
Rating: 5.0/5 (16 votes)
cleanliness - excellent (2)
porters/escalators - excellent (2)
food - excellent (2)
transportation - excellent (2)
lodging - excellent (2)
railfanning - excellent (2)
sightseeing - excellent (2)
safety - excellent (2)

Station News

Page#    Showing 61 to 80 of 138 News Items  <<prev  next>>
Jan 30 (12:26) Khandwa Residents Demand New Trains, Gauge Conversion, and Increased Train Stoppages
IR Affairs
CR/Central
20711 views
0

News Entry# 539268   
  Past Edits
Jan 30 2024 (12:28)
Station Tag: Akola Junction/AK added by AdittyaaSharma^~/1421836

Jan 30 2024 (12:28)
Station Tag: Sanawad/SWD added by AdittyaaSharma^~/1421836

Jan 30 2024 (12:28)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836
Khandwa News: अकोला, खंडवा व इंदौर होगा उत्तर से दक्षिण को जोड़ने वाला सबसे शार्ट कट रूट

The Jan Manch members in Khandwa have sent emails and letters to the Railway Minister and Prime Minister, demanding the introduction of new trains between Khandwa-Sanawad and Khandwa-Amulla Khurd. They also emphasized the need for a complete budget allocation to expedite the gauge conversion between Amulla-Akola and Sanawad-Mhow, highlighting the benefits...
more...
of this project. The proposed route is said to be the shortest one connecting North and South India, leading to significant distance and time savings for travelers between various cities like Indore-Mumbai, Indore-Pune, Indore-Bengaluru, Indore-Nagpur, and Indore-Hyderabad. Additionally, the members requested the inclusion of a dozen trains to stop at Khandwa station. Other demands include the swift completion of the Khandwa-Akola and Sanawad-Mhow broad gauge lines, the resumption of the Bhusaval-Khandwa-Nagpur train, the restoration of the Itarsi-Bhusaval train to its previous schedule, the immediate establishment of a ticket window, passenger waiting area, and parking on platform number six, extending the Kachiguda-Akola route to Khandwa, and extending the Tirupati-Akola route to Khandwa. The letter also emphasized the need to connect the Sanawad railway track to the Bhusaval and Itarsi railway tracks to facilitate passenger trains. They also requested the inclusion of Khandwa as a stoppage for trains like Yashwantpur-Chandigarh, Kalka-Shirdi, LTT-Patliputra, Rani Kamalapati-Pune, and Bikaner-Shirdi. They demanded the addition of general coaches to the Katni-Bhusaval train.

Khandwa ke Jan Manch ke logon ne Rail Minister aur Prime Minister ko email aur letter bheje hai, jisme unhone Khandwa-Sanawad aur Khandwa-Amulla Khurd ke beech new trains start karne ki demand ki hai. Unhone Amulla-Akola aur Sanawad-Mhow ke beech gauge conversion ke liye poora budget allocate karne ki bhi baat...
more...
ki hai, aur is project ke faayde bataye hai. Ye route north aur south India ko connect karne wala shortest route hai, jisse kai cities jaise Indore-Mumbai, Indore-Pune, Indore-Bengaluru, Indore-Nagpur, aur Indore-Hyderabad ke beech travel karne walon ko bahut samay aur fuel ki bachat hogi. Iske alawa, unhone Khandwa station pe ek dozen trains ko rokte rakhne ki bhi demand ki hai. Aise bhi demand hai: Khandwa-Akola aur Sanawad-Mhow broad gauge lines ko jaldi complete karna, Bhusaval-Khandwa-Nagpur train ko fir se chalana, Itarsi-Bhusaval train ko pehle ki schedule par chalana, platform number six pe ticket window, passenger waiting area, aur parking banane, Kachiguda-Akola route ko Khandwa tak badhana, aur Tirupati-Akola route ko Khandwa tak badhana. Letter me ye bhi bataya gaya hai ki Sanawad railway track ko Bhusaval aur Itarsi railway tracks se connect kiya jaaye taaki passenger trains chalai jaa sake. Unhone Yashwantpur-Chandigarh, Kalka-Shirdi, LTT-Patliputra, Rani Kamalapati-Pune, aur Bikaner-Shirdi jaise trains ke liye Khandwa ko stoppage banaane ki bhi demand ki hai. Unhone Katni-Bhusaval train me general coaches add karne ki demand bhi ki hai.
Jan 02 (16:15) Khandwa Poised for Growth in 2024 with Major Development Projects
Commentary/Human Interest
CR/Central
29911 views
0

News Entry# 535971   
  Past Edits
Jan 02 2024 (16:15)
Station Tag: Omkareshwar Road/OM added by SmallTownTraveller^~/1084688

Jan 02 2024 (16:15)
Station Tag: Sanawad/SWD added by SmallTownTraveller^~/1084688

Jan 02 2024 (16:15)
Station Tag: Khandwa Junction/KNW added by SmallTownTraveller^~/1084688
नया साल- पानी में सौर ऊर्जा बनेगी:एकात्म लोक का विस्तार, नेशनल हाईवे तैयार, ब्रॉडगेज पर दौड़ेगी ट्रेन; भगवान बालाजी देंगे दर्शन

Khandwa is set to gain national recognition in 2024 due to several major development projects. These projects, expected to be completed or take shape this year, will transform the district, bringing unprecedented growth and employment opportunities. Four key projects are highlighted: 1) [Project 1 Details] 2) [Project 2 Details] 3)...
more...
[Project 3 Details] 4) [Project 4 Details] These projects are expected to significantly impact Khandwa's future.

2024 mein, Khandwa ko kai bada bada project ke wajah se desh bhar mein pehchan milne wali hai. Is saal pura hone wala ya shape le raha ye project, Khandwa district ko aage badhayega aur naukri ke bahut saare mauke bhi layega. Chaar main project hain: 1) [Project 1 Details] 2)...
more...
[Project 2 Details] 3) [Project 3 Details] 4) [Project 4 Details]. Ye project Khandwa ke bhavishya ko badal dene wale hain.
Dec 23 2023 (12:49) Central Railway GM Inspects Khandwa Station, Announces New Train to Sanawad
IR Affairs
CR/Central
80379 views
1

News Entry# 534897   
  Past Edits
Dec 23 2023 (12:49)
Station Tag: Sanawad/SWD added by AdittyaaSharma^~/1421836

Dec 23 2023 (12:49)
Station Tag: Khandwa Junction/KNW added by AdittyaaSharma^~/1421836
Khandwa Railway Station: यात्रियों की सुविधा के लिए खंडवा से सनावद तक मार्च में शुरू हो सकती है ट्रेन

The General Manager (GM) of Central Railway, Ramkaran Yadav, visited Khandwa railway station on Friday evening for an annual inspection. Accompanied by senior officials, including the Divisional Railway Manager (DRM) of Bhusawal, Iti Pandey, he inspected the station's facilities and infrastructure. He was satisfied with the cleanliness, painting, and beautification of...
more...
the station. He inaugurated an escalator on platform number five and gave instructions to officials after inspecting platform number six. The Mayor of Khandwa, Amrita Yadav, met with the GM, raising concerns about the traffic congestion caused by auto-rickshaws being parked outside the station. The GM assured her of addressing the issue. Several organizations, including the coolie union and social institutions, presented memorandums and welcomed the GM. The station master, Arvind Kumar Shah, was awarded Rs 5,000 for his good work and the station's well-maintained facilities. The GM promised to fulfill all demands by March and announced the launch of a train service from Khandwa to Sanawad in March. The GM's visit spurred improvements in the station's facilities, including the commencement of the escalator on platform number five, the installation of a large LED screen to display train information, and the creation of a garden in the outer area. The GM's visit also prompted demands for a new MEMU train for the Khandwa-Sanawad route, a dedicated local train service between Khandwa-Bhusawal-Akola, and a shift in the operating hours of the 11115/16 MEMU train currently running between Bhusawal and Itarsi in the night to daytime. The aim is to improve the passenger experience and make better use of rail resources.

Central Railway ke GM, Ramkaran Yadav, ne Friday evening ko Khandwa railway station ka annual inspection ke liye visit kiya. Senior officials, jaise Bhusawal ke DRM, Iti Pandey, bhi unke saath the. Unhone station ke facilities aur infrastructure ki inspection ki. Woh station ki safai, rang-rogan, aur beautification se khush the....
more...
Unhone platform number five pe ek escalator ka shubhaarambh kiya aur platform number six ki inspection ke baad officials ko instructions diye. Khandwa ki Mayor, Amrita Yadav, ne GM se mulakat ki aur station ke bahar auto-rickshaws park hone se traffic jam ki problem ko uthaya. GM ne unhe is issue ko resolve karne ka assurance diya. Kai organizations, jaise coolie union aur social institutions, ne GM ko memorandums diye aur unka swagat kiya. Station master, Arvind Kumar Shah, ko unki achhi performance aur station ki well-maintained facilities ke liye Rs 5,000 ka award diya gaya. GM ne March tak sabhi demands ko pura karne ka promise kiya aur March mein Khandwa se Sanawad tak train service start karne ka announcement kiya. GM ke visit ne station ke facilities mein improvement layi, jaise platform number five pe escalator start hone, train information display karne ke liye ek badi LED screen lagne aur station ke bahar garden banne. GM ke visit ne Khandwa-Sanawad route pe ek nayi MEMU train, Khandwa-Bhusawal-Akola ke beech dedicated local train service, aur 11115/16 MEMU train (Bhusawal-Itarsi) ke operating hours ko night se daytime mein shift karne ki demands bhi uthayi. Yeh sab passenger experience ko behtar banane aur rail resources ka behtar use karne ke liye kiya gaya.
Dec 16 2023 (11:23) Heritage Train in Indore to Be Discontinued Due to Low Passenger Numbers
Tourism
WR/Western
60857 views
1

News Entry# 534063   
  Past Edits
Dec 16 2023 (11:25)
Station Tag: Kalakund/KKD added by AdittyaaSharma^~/1421836

Dec 16 2023 (11:25)
Station Tag: Patal Pani/PTP added by AdittyaaSharma^~/1421836
Heritage Train in indore: हेरिटेज ट्रेन बंद होने से पहले सामान्य श्रेणी में लगी वेटिंग

The heritage train running between Patalpani and Kalakund in Indore is set to be discontinued due to low passenger numbers. The train, which began operation in the monsoon season, initially ran on Saturdays and Sundays, later expanding to include Fridays due to high demand. However, passenger numbers have declined significantly, leading...
more...
to its potential closure. The railway track between Mahu and Patalpani has been removed due to gauge conversion work between Mahu and Sanawad. As a result, the heritage train's operation this year has been shifted to Patalpani station. The train's operation may be halted this month, with booking currently available on the IRCTC website until January 14th, while senior railway officials have indicated a closure this month.

Indore mein Patalpani aur Kalakund ke beech chalne wali Heritage Train ko kam passengers hone ki wajah se band karne ja raha hai. Monsoon season mein shuru hui yeh train, shuru mein Saturday aur Sunday ko chalti thi, baad mein zyada demand dekhte hue Friday ko bhi chalai jaane lagi. Par,...
more...
ab passengers kam ho gaye hain, jisse yeh train band hone wali hai. Mahu aur Sanawad ke beech gauge conversion ka kaam hone ki wajah se Mahu se Patalpani tak ka railway track hata diya gaya hai. Is wajah se is saal Kalakund ki wadiyon mein chalne wali Heritage Train ka operation Patalpani railway station se kiya gaya hai. Is mahine se yeh train band ho sakti hai, IRCTC ki website par booking 14 January tak ho rahi hai, jabki railway ke senior officers is mahine se hi isko band karne ki baat kar rahe hain.

Rail News
57420 views
1

Dec 16 2023 (11:29)
Rajapryagraaj
Rajapryagraaj   20 blog posts
Re# 5912787-1              
Whts going on
Translate to English
Translate to Hindi
Dec 05 2023 (20:05) Broad Gauge Railway Line Construction Tendered Between Mhow and Sanawad
New Facilities/Technology
33892 views
2

News Entry# 532732   
  Past Edits
Dec 05 2023 (20:05)
Station Tag: Sanawad/SWD added by HemangMankad~/2196174

Dec 05 2023 (20:05)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by HemangMankad~/2196174
MP: 900m-long Rail Bridge On Narmada To Be Ready In 10 Months In Mhow

Separate tenders are being issued for the construction of broad gauge railway lines on the new route between Mhow and Sanawad. The route includes the stations Dr. Ambedkar Nagar (Mhow) and Sanawad.

Mhow aur Sanawad ke beech ek nayi route pe broad gauge railway lines banane ke liye alag alag tenders nikale jaa rahe hain. Is route mein Dr. Ambedkar Nagar (Mhow) aur Sanawad station hain.

Rail News
30429 views
1

Dec 06 2023 (09:41)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Re# 5902073-1              
Pillars of Old MG Bridge must be strengthened & be used to make a Road Bridge.
Translate to English
Translate to Hindi
Page#    Showing 61 to 80 of 138 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy