n a breakthrough in the Khurda Road-Bolangir rail line project, the East Coast Railway (ECoR) has successfully completed the construction of a 1,975-metre long tunnel (Tunnel...
## Odisha Railway Line Gets a New Tunnel
The East Coast Railway (ECoR) has completed construction of a 2-kilometer long tunnel on the Khurda Road-Visakhapatnam railway line in Odisha. This tunnel, located near the village of Patalganga, is a significant part of the doubling project of the existing single line between Visakhapatnam and Khurda Road. The project aims to enhance connectivity and ensure smooth railway operations in the region.
The tunnel, built at a cost of over ₹150 crores, was constructed using the New Austrian Tunneling Method (NATM). This modern technique utilizes controlled blasting and supports the tunnel with a reinforced concrete lining. The completion of this tunnel is a major milestone in the doubling project and will significantly improve the efficiency and capacity of the railway line.
डुमरिया थाना क्षेत्र के आस्ताकोवाली पंचायत के चाईडीहा गांव के विश्वनाथ सरदार 35 की मंगलवार सुबह ट्रेन से गिरकर मौत हो गयी...
डुमरिया...
डुमरिया थाना क्षेत्र के आस्ताकोवाली पंचायत के चाईडीहा गांव निवासी धानो सरदार 40 चैन्नई के किसी कंपनी में काम करते थे। घर वापसी के क्रम...