Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 13 16:25:36 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
no description available
Entry# 5797759-0

REAI/Reasi (2 PFs)
रियासी
رِیاسی

Track: Single Electric-Line

Updated: Jun 30 (01:40)

Station Address

Reasi Station Road, Chaurakot, Reasi - 182 311
State: Jammu and Kashmir

Elevation: 808 m above sea level
Type: Regular   Category: n/a
Zone: NR/Northern   Division: Firozpur


No Recent News for REAI/Reasi
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 4.4/5 (4 votes)
cleanliness - excellent (2)
porters/escalators - n/a (0)
food - n/a (0)
transportation - good (2)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station News

Page#    Showing 61 to 80 of 84 News Items  <<prev  next>>
May 05 (13:58) Jammu-Baramulla Rail Link Faces Delays due to Tunnel Construction Challenges
IR Affairs
NR/Northern
25145 views
1

News Entry# 551056   
  Past Edits
May 05 2024 (14:09)
Station Tag: Jammu Tawi/JAT added by AdittyaaSharma^~/1421836

May 05 2024 (14:09)
Station Tag: SMVD Katra/SVDK added by AdittyaaSharma^~/1421836

May 05 2024 (14:09)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836

May 05 2024 (14:09)
Station Tag: Sangaldan/SGDN added by AdittyaaSharma^~/1421836

May 05 2024 (14:09)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836
Srinagar-Jammu rail link delayed by 7 months as Katra-Banihal rail link face hurdles at Tunnel 1

The Jammu-Baramulla rail link project, connecting Kashmir to the rest of India, is facing delays due to challenges in constructing Tunnel 1 near Katra. The 3.2-km tunnel is expected to take another 6-7 months to complete. The project has encountered geological and technical issues, including cavities and loose strata,...
more...
typical of the young mountains in the region. However, advanced technology has helped overcome these obstacles. The Konkan Railway, responsible for the project, has also successfully constructed the world's highest single arch railway bridge over the Chenab River. The train service between Sangaldan and Reasi is nearly complete and expected to begin within a month, offering a glimpse of the progress made on the larger project. The entire Jammu-Baramulla rail link, spanning 338 km, is expected to provide a much-needed rail connection to Kashmir, complementing existing road and air travel options.

Kashmir ko India se rail se connect karne wala Jammu-Baramulla rail link project, Katra ke paas Tunnel 1 banne mein dikkat aa rahi hai. 3.2 km lamba tunnel poora hone mein abhi 6-7 mahine lagega. Project mein geology aur technology related problems aayi hain, jaise cavities aur loose strata,...
more...
jo is region ke young mountains ki wajah se hai. Lekin, advanced technology se yeh problems overcome ki gayi hain. Konkan Railway, jo project ke liye responsible hai, usne Chenab River par duniya ka sabse uncha single arch railway bridge bhi banaya hai. Sangaldan aur Reasi ke beech train service almost ready hai aur ek mahine ke andar shuru hone wali hai, yeh bada project ka progress dikha raha hai. 338 km lamba Jammu-Baramulla rail link, Kashmir ko rail se desh se jodne wala hai, aur road aur air travel ke saath ek aur option dega.
Mar 25 (09:21) Anji Bridge: Connecting Kashmir to India
IR Affairs
NR/Northern
21592 views
0

News Entry# 546094   
  Past Edits
Mar 25 2024 (09:21)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836

Mar 25 2024 (09:21)
Station Tag: SMVD Katra/SVDK added by AdittyaaSharma^~/1421836

Mar 25 2024 (09:21)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836
कश्मीर: अंजी ब्रिज पर रेल ट्रैक बिछाने का काम जारी

The construction of the Anji bridge, which will connect Kashmir to the rest of India, has been completed. Railway track laying work is underway. The bridge is built over the Anji River, a tributary of the Chenab. Situated 331 meters above the riverbed, the bridge offers a breathtaking view. It...
more...
is supported by 96 cables.

Kashmir ko desh se jodne wala Anji bridge ban kar taiyar ho gaya hai. Yahan pe rail track bhichane ka kaam chal raha hai. Yeh bridge Anji nadi par bana hai, jo ki Chenab ki ek sahaayak nadi hai. Nadi ke tal se lag bhag 331 meter upar latke yeh bridge...
more...
ka nazara bahut hi khoobsurat hai. Ismein 96 cables ko support dekar fix kiya gaya hai.
Feb 11 (08:19) Residents Threaten to Boycott Elections if Kodi Railway Station is Not Built
Other News
NR/Northern
23651 views
0

News Entry# 540973   
  Past Edits
Feb 11 2024 (08:19)
Station Tag: Banihal/BAHL added by AdittyaaSharma^~/1421836

Feb 11 2024 (08:19)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836

Feb 11 2024 (08:19)
Station Tag: Udhampur/UHP added by AdittyaaSharma^~/1421836

Feb 11 2024 (08:19)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836
Udhampur News: स्टेशन नहीं बना तो लोकसभा चुनावों का बहिष्कार करेंगे छह पंचायतों के ग्रामीण

Residents of six panchayats in Reasi district, Jammu and Kashmir, have threatened to boycott all future elections if a railway station is not built in Kodi. The residents claim that the station was initially planned as part of the Udhampur-Srinagar-Baramulla Rail Link project but is now being constructed in Dugga, forcing...
more...
them to travel 35 km by road to reach the station. They argue that the station should be built in Kodi because it is directly connected to the world's highest railway bridge over the Chenab River, which has one end in Bakkal and the other in Kodi. The residents presented a memorandum to the Deputy Commissioner (DC) demanding the construction of the station in Kodi, who assured them that he would raise the matter with the railway authorities.

Reasi district ke chhe panchayat ke logon ne dhamki di hai ki agar Kodi mein railway station nahi banta hai toh woh aane waale saare chunaav ka bahishkar karenge. Logon ka kehna hai ki Udhampur-Srinagar-Baramulla Rail Link project mein Kodi mein station banna tha lekin ab woh Dugga mein ban...
more...
raha hai. Is wajah se logon ko station tak pahunchne ke liye 35 km road se safar karna padega. Logon ne argue kiya ki Kodi mein station banna chahiye kyonki woh Chenab River par banaye gaye dunia ke sabse unche railway bridge se directly connect hai, jiska ek taraf Bakkal aur dusra taraf Kodi hai. Logon ne DC ko memorandum submit kiya aur Kodi mein railway station banane ki demand ki. DC ne logon ko bharosa diya ki woh railway authority se baat karenge aur is maamle ko logon ke hak mein laane ki koshish karenge.
Feb 10 (20:14) Railway Board Chair Inspects Progress of USBRL Project, Expresses Satisfaction with Work
IR Affairs
NR/Northern
33787 views
0

News Entry# 540879   
  Past Edits
Feb 10 2024 (20:14)
Station Tag: Sawalkote/BSNDHR added by AdittyaaSharma^~/1421836

Feb 10 2024 (20:14)
Station Tag: Dugga/DUGGA added by AdittyaaSharma^~/1421836

Feb 10 2024 (20:14)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836

Feb 10 2024 (20:14)
Station Tag: SMVD Katra/SVDK added by AdittyaaSharma^~/1421836

Feb 10 2024 (20:14)
Station Tag: Firozpur Cantt. Junction/FZR added by AdittyaaSharma^~/1421836

Feb 10 2024 (20:14)
Station Tag: Jammu Tawi/JAT added by AdittyaaSharma^~/1421836
Railway Board Chairman carries out inspection of USBRL project

On February 10th, 2024, Railway Board Chair Jaya Varma Sinha inspected the progress of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. The inspection covered various sections including Katra to Tunnel T-33, Tunnel T-34, Anji Bridge, Reasi Station, Bakkal Station, Chenab Bridge, and Dugga railway station. Sinha expressed satisfaction with the overall progress,...
more...
particularly praising the work done under challenging geological conditions. She emphasized the importance of safety protocols and directed the project authorities to expedite the completion of remaining works, specifically the Katra-Reasi section, Tunnel T-1, and Sawalkote yard works. Sinha highlighted the significance of the USBRL project in connecting Kashmir Valley to the rest of the Indian railway network. The inspection involved various senior officials from the Railway Board, Northern Railway, and other relevant organizations.

10 February 2024 ko, Railway Board ke Chairman Jaya Varma Sinha ne USBRL project ka inspection kiya. Katra se Tunnel T-33, Tunnel T-34, Anji Bridge, Reasi Station, Bakkal Station, Chenab Bridge aur Dugga railway station tak inspection kiya gaya. Sinha ji ne kaam ki progress pe khushi jahir ki, aur...
more...
challenging geological conditions mein kaam karne wale team ko appreciate kiya. Unhone safety protocol ko follow karne ka order diya aur project authorities ko remaining works ko jaldi complete karne ke liye kaha, khaas karke Katra-Reasi section, Tunnel T-1 aur Sawalkote yard works ko. Sinha ji ne USBRL project ke Kashmir Valley ko rest of the Indian railway network se connect karne ke importance ko highlight kiya. Inspection mein Railway Board, Northern Railway aur other relevant organizations ke senior officials shamil the.
Jan 15 (01:47) CRS Conducts Second Inspection of Banihal-Khari Track on USBRL Project
IR Affairs
NR/Northern
29544 views
2

News Entry# 537561   
  Past Edits
Jan 15 2024 (01:49)
Station Tag: MCTM Udhampur/MCTM added by Abhijay2407/349977

Jan 15 2024 (01:49)
Station Tag: SMVD Katra/SVDK added by Abhijay2407/349977

Jan 15 2024 (01:49)
Station Tag: Reasi/REASI added by Abhijay2407/349977

Jan 15 2024 (01:48)
Station Tag: Baramula/BRML added by Abhijay2407/349977

Jan 15 2024 (01:48)
Station Tag: Srinagar Kashmir/SINA added by Abhijay2407/349977

Jan 15 2024 (01:47)
Station Tag: Banihal/BAHL added by Abhijay2407/349977

Jan 15 2024 (01:47)
Station Tag: Khari (Arpinchala)/NCLNA added by Abhijay2407/349977
Udhampur-Srinagar-Baramulla Rail Link Project:  CRS conducts second inspection on Banihal-Khari section, says ‘infrastructure ready for commissioning’

On January 3rd, the Commissioner of Railway Safety (CRS) conducted the second round of inspections for the 14.869 km track between Banihal and Khari, part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. This inspection is a statutory requirement for the newly completed track.

3 January ko, Commissioner of Railway Safety (CRS) ne Udhampur-Srinagar-Baramulla Rail Link (USBRL) project ke Banihal aur Khari ke beech ke 14.869 km track pe doosra round ka inspection kiya. Ye inspection newly completed track ke liye statutory requirement hai.
Page#    Showing 61 to 80 of 84 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy