Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 19:25:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

CWA/Chhindwara Junction (6 PFs)
छिन्दवाड़ा जंक्शन

Track: Single Electric-Line

Updated: Yesterday (21:04)
Chhindwara Junction (CWA) is a major railway station in Chhindwara, Madhya Pradesh. It is located on the Howrah-Nagpur-Mumbai line and has six platforms. The station offers amenities such as waiting rooms, restrooms, and food stalls. It's a popular stop for tourists visiting the nearby wildlife sanctuaries and temples.

Tourism

Shri Ram Mandir: A revered temple dedicated to Lord Ram.
Hanuman Mandir: A popular temple dedicated to Lord Hanuman.
Gurudwara Sahib: A peaceful and serene Sikh temple.
Jama Masjid: A historic mosque with beautiful architecture.
Chhindwara Fort: A historic fort offering panoramic views of the city.

Food

Shri Ram Sweets: Famous for their delicious sweets and snacks.
Aashish Restaurant: Offers a variety of vegetarian dishes at reasonable prices.
Shree Krishna Bhojanalaya: A popular spot for vegetarian thalis and snacks.
Raju Sweets: Known for their fresh and flavorful sweets and snacks.
The Vegetarian Corner: A casual vegetarian eatery with a wide selection of dishes.

Station Address

Off. Chhindwara - Seoni Road (NH 347), Pataleshwar Road, Triloki Nagar, Chhindwara - 480 001
State: Madhya Pradesh

Elevation: 673 m above sea level
Type: Junction   Category: NSG-5
Zone: SECR/South East Central   Division: Nagpur


Number of Platforms: 6
Number of Halting Trains: 8
Number of Originating Trains: 7
Number of Terminating Trains: 7
2 Follows
Rating: 3.6/5 (32 votes)
cleanliness - good (4)
porters/escalators - average (4)
food - average (4)
transportation - good (4)
lodging - good (4)
railfanning - good (4)
sightseeing - excellent (4)
safety - good (4)

Station Forum

Page#    Showing 1 to 5 of 1064 blog entries  next>>
Rail News
8283 views
1

IR Affairs
SECR/South East Central
Today (13:47)   Changes in Train Operations in Madhya Pradesh Due to Bridge Repair

AdittyaaSharma^~   73037 news posts
Entry# 6181749   News Entry# 568418         Tags   Past Edits
1 compliments
Great
read full article... परिवर्तित मार्ग से चलेगी नागपुर शहडोल एक्सप्रेस, इन स्‍टेशनों से होकर गुजरेगी

Due to repair work on a cracked bridge on the Nagpur-Chhindwara line, the Nagpur-Shahdol-Nagpur Express (11201/11202) will be operating on a changed route from September 6th to December 6th. The Nagpur-Shahdol Express (11201) departing from Nagpur will take the Nagpur-Amla-Chhindwara route, while the Shahdol-Nagpur Express (11202) departing from Shahdol will take...
more...
the Chhindwara-Amla-Nagpur route. Additionally, the Rewa-Netaji Subhash Chandra Itwari-Rewa Express (11754-11753) will now make a stop at the Tumsa Road station, starting September 7th for 11754 and September 8th for 11753. This will provide direct rail service to the area for travel to both Nagpur and Rewa. The South East Central Railway Nagpur Division has also resumed the suspended MEMU train services between Gondia-Wadsa-Chandafort, with train 08806 Gondia-Wadsa MEMU restarting on September 7th, train 08808 Wadsa-Chandafort MEMU restarting on September 8th, and train 08805 Chandafort-Gondia MEMU restarting on September 8th, all operating on their previous schedules.

Nagpur-Shahdol-Nagpur Express (11201/11202) ka operation change route se hoga, kyunki Nagpur-Chhindwara line pe railway bridge me crack ke repair ka kaam chal raha hai. 6 September se 6 December tak Nagpur se chalu hone wali 11201 Nagpur-Shahdol Express, Nagpur-Amla-Chhindwara route se chalegi, aur 7 September se 7 December tak Shahdol se...
more...
chalu hone wali 11202 Shahdol-Nagpur Express, Chhindwara-Amla-Nagpur route se chalegi. Iske saath hi, Rewa-Netaji Subhash Chandra Itwari-Rewa Express (11754-11753) ab Tumsa Road station pe rukengi. 11754 7 September se aur 11753 8 September se rukengi. Isse is area ke logon ko Nagpur aur Rewa dono direction ke liye direct rail service ka benefit milega. South East Central Railway Nagpur Division ne Gondia-Wadsa-Chandafort ke beech suspended MEMU train services ko bhi restart kiya hai. 08806 Gondia-Wadsa MEMU 7 September se, 08808 Wadsa-Chandafort MEMU 8 September se aur 08805 Chandafort-Gondia MEMU 8 September se apne pehle schedule se chali jaayengi.

More Posts
Rail News
5883 views
0

SECR/South East Central
Yesterday (18:09)   Bridge Collapse Threatens Train Services in Sivni, Raises Concerns Over Construction Quality

SGRFC^~   168 news posts
Entry# 6180908   News Entry# 568290         Tags   Past Edits
read full article... Railway: रेलवे बोर्ड की रिपोर्ट के बाद ही शुरु हो पाएगा ब्रिज नंबर-94 का कार्य, करना पड़ेगा लंबा इंतजार

A bridge (Bridge No. 94) on the Sivni-Itwari railway section, between Bhandarkund and Bhimalgondi, has developed cracks. The railway board sent a team to inspect the bridge and prepare a report on the cause of the cracks and preventive measures. A new bridge will be constructed, for which the tender process...
more...
will take at least a month. The construction of the new bridge is estimated to take 5-6 months, which would mean that train services between Sivni and Nagpur will be disrupted for six months. The incident occurred despite the DRM (Divisional Railway Manager) inspecting the bridge on August 22nd and declaring it to be in good condition. This has raised questions about the effectiveness of the inspection. The bridge was built at a cost of 2.5 crores and has already incurred maintenance expenses of 3.5 crores in just three years. The bridge has been a subject of controversy since its construction, with the CRS (Commissioner of Railway Safety) raising concerns about the quality of work. The bridge had been permitted to operate trains at a speed of 20 km/h and required 24-hour monitoring. The entire project, encompassing the Chhindwara-Sivni-Nanpur-Mandla Fort railway line and the Chhindwara-Itwari line, cost a combined 2700 crores and was completed after seven years of construction. Although train services are available, they are frequently canceled, causing inconvenience to passengers.

Sivni-Itwari railway section mein Bhandarkund aur Bhimalgondi ke beechwala bridge (Bridge No. 94) mein cracks aa gayi hain. Railway board se team ne bridge ka inspection kiya aur cracks ke karan aur preventive measures ke liye report banayi. Ab new bridge banaya jaayega, jiske liye tender process mein kam se kam...
more...
ek mahina lagega. New bridge banne mein 5-6 mahine lag sakte hain, is wajah se Sivni aur Nagpur ke beech train services chhe mahine band rahenge. August 22nd ko DRM ne bridge ka inspection kiya tha aur usne bridge ko thik bataya tha, lekin do din baad bridge mein cracks aa gayi. Is se inspection ke effectiveness ke baare mein sawal uth rahe hain. Bridge ko banne mein 2.5 crore rupay kharch hue the aur sirf teen saal mein 3.5 crore rupay maintenance mein kharch ho chuke hain. Bridge banne se hi uspe sawal uth rahe hain, CRS ne bridge ke kaam ki quality pe bhi sawal uthaye the. Bridge pe 20 km/h ki speed se train chalane ki permission thi aur 24-hour monitoring ki jarurat thi. Chhindwara-Sivni-Nanpur-Mandla Fort aur Chhindwara-Itwari lines ka project 2700 crore rupay ka tha aur yeh project saat saal mein pura hua. Halanki train services chal rahi hain, lekin unko aajkal baar baar cancel kiya ja raha hai, isse yaatriyon ko pareshani ho rahi hai.
General Travel
15076 views
0

Sep 05 (20:43)   JBP/Jabalpur (7 PFs)
SGRFC^~
SGRFC^~   2707 blog posts
Entry# 6180042            Tags   Past Edits
click here
Need Amrit Bharat Express trains in
Jabalpur Gondia Broadgauge, Jabalpur Nainpur Seoni Chhindwara Nagpur,Nainpur Mandla fort,Balaghat Tumsar Broadgauge
If people are not demending or have patience for the construction of bypass lines
Translate to English
Translate to Hindi
Rail News
229798 views
2

Politics
SECR/South East Central
Jun 28 (14:46)   Chhindwara MP Pushes for Improved Railway and Road Infrastructure

SGRFC^~   168 news posts
Entry# 6108211   News Entry# 558030         Tags   Past Edits
read full article... शपथ लेते ही एक्शन में छिंदवाड़ा सांसद विवेक बंटी साहू, रेल व सड़क मंत्री से की नई मांग - MP Vivek Sahu in Action

Chhindwara MP Bunty Vivek Sahu has been actively pursuing the development of his district since assuming office. He met with the Union Railway Minister and the Union Road Transport Minister, requesting the resumption of several train stops, the introduction of new trains, and the construction of a four-lane highway. He specifically...
more...
requested the introduction of a train line from Narsinghpur to Sagar, the double-tracking of the Chhindwara-Nagpur line, and the resumption of the Dada Dhaam Express. He also requested the inclusion of a stop for the Patalkot Express at Sonagirji, a Jain pilgrimage site, to cater to the religious needs of the local population. Additionally, he advocated for the introduction of the Duranto Express from Chhindwara to Mumbai, the extension of the Vande Bharat Express to Chhindwara from Nagpur and to Ujjain and Indore, and the reinstatement of the stops for various trains at Pandhurna, which has recently been elevated to a district. These stops were previously discontinued due to the COVID-19 pandemic.

Chhindwara ke MP Bunty Vivek Sahu apna district ke development ke liye bahut active ho gaye hain, jabse unhone office sambhala hai. Unhone Union Railway Minister aur Union Road Transport Minister se mulaqat ki aur unhone kaafi trains ke stoppages ko fir se start karne, new trains start karne, aur ek...
more...
four-lane highway banwane ki demand ki. Unhone specifically demand kiya ki Narsinghpur se Sagar tak ek train line shuru ki jaaye, Chhindwara-Nagpur line ko double track kiya jaaye, aur Dada Dhaam Express ko fir se start kiya jaaye. Unhone Patalkot Express ka stop Sonagirji mein bhi include karne ki demand ki, jo ki ek Jain pilgrimage site hai, local population ke religious needs ko fulfill karne ke liye. Unhone Duranto Express ko Chhindwara se Mumbai tak shuru karne, Vande Bharat Express ko Nagpur se Chhindwara tak aur Ujjain aur Indore tak extend karne, aur Pandhurna mein kaafi trains ke stops ko fir se start karne ki demand bhi ki. Ye stops pehle COVID-19 pandemic ke wajah se band kiye gaye the.
General Travel
129543 views
1

Aug 22 (18:02)   11201/Nagpur - Shahdol Express | ABKP/Ambikapur (1 PFs)
SGRFC^~
SGRFC^~   2707 blog posts
Entry# 6165170            Tags   Past Edits
Link:
click here
मेरी रेलवे से दस से बारह मांगे हैं
1. अंबिकापुर नागपुर नया ट्रेन चाहिए शहडोल कटनी जबलपुर नैनपुर सिवनी छिंदवाड़ा के रास्ते या फिर अंबिकापुर दुर्ग एक्सप्रेस ट्रेन को नागपुर तक विस्तार किया जाए
...
more...
2. अंबिकापुर मुम्बई नया ट्रेन चाहिए शहडोल कटनी जबलपुर नैनपुर बालाघाट गोंदिया के रास्ते
3. अंबिकापुर इंदौर नया ट्रेन चाहिए
4 .अंबिकापुर से अयोध्या तक नया ट्रेन चाहिए प्रयागराज होते हुए
5. अम्बिकापुर से रीवा तक नया ट्रेन चाहिए
6 .अम्बिकापुर से कोलकाता हावड़ा एक्सप्रेस नया ट्रेन चाहिए
7. चिरमिरी रीवा ट्रेन को पहले तरह नियमित रूप से प्रतिदिन चलाया जाए
8.रीवा बिलासपुर ट्रेन को रायपुर या दुर्ग तक विस्तार किया जाए जल्द से जल्द
9शहडोल नागपुर एक्सप्रेस ट्रेन को शहडोल से ना चला कर अनुपपुर जंक्शन से चलाओ या फिर अंबिकापुर से डायरेक्ट नागपुर के लिए चलाओ और ट्रेन का नाम विंध्य एक्सप्रेस रखो
10.शहडोल से रीवा तक एक नई रेल लाइन बिछाई जाए उसका रूट होगा ( शहडोल से जैतपुर फिर जैतपुर से जयसिंहनगर फिर जयसिंहनगर से ब्यौहारी फिर ब्यौहारी से आगे रीवा तक)
11. सभी ट्रेन को LHB कोच के साथ चलाया जाए
12.अंबिकापुर निजामुद्दीन एक्सप्रेस ट्रेन में सिर्फ 4 जनरल कोच जोड़ने से कुछ नहीं होगा इस ट्रेन में 7 स्लीपर कोच जोड़ना चाहिए तथा 4 जनरल कोच तो जुड़ ही रहा है इसलिए रेलवे प्रशासन और भारत सरकार को इस पर ध्यान देना चाहिए और इस ट्रेन को हफ्ते में काम से कम 3 दिन दौड़ना चाहिए हफ्ते में एक दिन चलाने से कुछ नहीं होता है और इस ट्रेन को कोतमा रेलवे स्टेशन पर स्टॉपेज देना चाहिए यह काम जल्दी से जल्दी हो जाना चाहिए
13.मंडला फोर्ट से डिंडोरी होते हुए अनूपपुर तक एक नई रेल लाइन बिछाई जाए
14. अंबिकापुर से बरवाडीह तक नई रेलवे लाइन तथा अंबिकापुर कोरबा रेलवे लाइन और अंबिकापुर रेणुकूट रेलवे लाइन बिछाई जाए जिससे छत्तीसगढ़ और दक्षिण पूर्व विंध्य क्षेत्र के लोगों को मदद होगी सहूलियत होगी और यात्रा जल्दी और सुगम होगी और अगर सारे मांग पूर्ण नहीं हो पाते हैं तो कम से कम क्रमांक 1,3,7,8,9,10,12,14 को पूरा किया जाए 🙏🙏🥺👍
मुझे आशा है कि मेरी बात भारत सरकार तक जरूर पहुंचेगी
धन्यवाद 🙏🫂😊❤️


AMBIKAPUR RAIL PROJECTS AND DEMENDS
JABALPUR GONDIA BROADGAUGE DEMENDS
CHHINDWARA SEONI NAINPUR BROADGAUGE DEMENDS

Translate to English
Translate to Hindi

More Posts
Page#    Showing 1 to 5 of 1064 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy