Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 21:34:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

OM/Omkareshwar Road (2 PFs)
Local Name: Mortakka
ओंकारेश्वर रोड
اومکاریشور روڈ

Track: Construction - Gauge Conversion

Updated: Oct 03 2022 (12:07) by Yusuf_Azhar^

Station Address

Khandwa Rd, Mortakka, Distt. Khandwa 450554
State: Madhya Pradesh

Elevation: 182 m above sea level
Type: Regular   Category: n/a
Zone: WR/Western   Division: Ratlam


No Recent News for OM/Omkareshwar Road
Nearby Stations in the News
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 4.2/5 (16 votes)
cleanliness - excellent (2)
porters/escalators - good (2)
food - good (2)
transportation - excellent (2)
lodging - good (2)
railfanning - good (2)
sightseeing - excellent (2)
safety - good (2)

Station Forum

Page#    Showing 16 to 20 of 132 blog entries  <<prev  next>>
Rail News
57155 views
0

IR Affairs
WR/Western
Jul 06 (19:52)   Khandwa Railway Station Upgrades with Automated System, Train Schedules Affected

Exynos9611~   18749 news posts
Entry# 6116567   News Entry# 559216         Tags   Past Edits
read full article... खंडवा में भुसावल-इटारसी रूट से जुड़ेगी अकोला-इंदौर रेल लाइन

The Khandwa railway station is undergoing installation of an automatic NI system for improved train operations. This system, expected to be operational by July 22nd, will connect the Akola-Indore rail line with the Bhusawal-Itarsi route via track interlocking. The new system aims to enhance efficiency, including connecting Platform 3 (Indore...
more...
route) to Platform 5 (Bhusawal-Sanawad route), enabling MEMU train operations between Bhusawal and Sanawad via Khandwa, a request made by local residents and MP Gyaneshwar Patil to the Railway Minister. Currently, MEMU trains are routed via Mathela to Bhusawal for maintenance. The new system will also allow trains to access Platforms 1, 3, and 6, reducing time spent on shunting and avoiding delays caused by manual operations. This computerized system is expected to significantly decrease the chances of accidents. The schedule for Khandwa-Sanawad MEMU and Bhir Shuttle trains has been suspended until July 22nd, with individual train schedules being adjusted daily. Trains traveling via Khandwa to Mumbai, Delhi, Uttar Pradesh, and Bihar will operate as per schedule until July 8th. However, six trains, including the 11057 CMS-Amritsar Express, 22177 CMS-Banaras, 12720 Hyderabad-Jaipur, 22538 LTT-Gorakhpur, 12628 Nanded, and 22130 Ayodhya Cantt-LTT will experience delays on July 8th and 9th.

Khandwa railway station pe automatic NI system lagane ka kaam shuru ho gaya hai, jiska matlab hai ki train operations bahut hi behtar honge. yeh system 22 July tak khul jaayega aur Akola-Indore rail line ko Bhusawal-Itarsi route se jod dega. Isse Platform 3 (Indore route) ko Platform 5 (Bhusawal-Sanawad...
more...
route) se jodne ka bhi fayda hoga, jisse Khandwa se Bhusawal aur Sanawad ke beech MEMU train chalane ka rasta khulega. yeh chahat local logo aur MP Gyaneshwar Patil ne Railway Minister se ki thi. Abhi MEMU trains ko maintenance ke liye Bhusawal jane ke liye Mathela se ho kar le jaana padta hai. Naya system Platforms 1, 3, aur 6 pe trains aaane jaane ki imkan dega, jisse shunting ke samay mein kami aayegi aur accident ke chances bhi bahut kam honge. 22 July tak Khandwa-Sanawad MEMU aur Bhir Shuttle trains band hain, aur har din ke liye alag alag trains ka schedule change kiya ja raha hai. 8 July tak Mumbai, Delhi, UP, aur Bihar jaane wali trains apne time pe chalengi, lekin 8-9 July ko 6 trains, jisme 11057 CMS-Amritsar Express, 22177 CMS-Banaras, 12720 Hyderabad-Jaipur, 22538 LTT-Gorakhpur, 12628 Nanded, aur 22130 Ayodhya Cantt-LTT, apne time se der se chalengi.
General Travel
16043 views
4

Jun 30 (09:59)   SWD/Sanawad (3 PFs)
guest
Entry# 6109701            Tags   Past Edits
1 compliments
Great
Omkareshwar sanawad bg Railway line CRS
July 24 end..
Translate to English
Translate to Hindi
Rail News
21297 views
1

New/Special Trains
CR/Central
Jun 13 (10:36)   Additional MEMU Train Services Introduced for Shiv Puran Katha Attendees in Omkareshwar

AdittyaaSharma^~   73037 news posts
Entry# 6093767   News Entry# 555902         Tags   Past Edits
read full article... Pandit Pradeep Mishra Katha: कथा सुनने आने वाले श्रद्धालुओं के लिए मेमू ट्रेन 15 जून तक लगाएगी दो फेरे

A large number of devotees are visiting Thapna village near Omkareshwar to attend the Shiv Puran Katha by Pandit Pradeep Mishra. To facilitate the influx, additional MEMU train services have been added between Khandwa and Sanawad. The devotees are also visiting Omkareshwar and Mamleshwar temples. On an average, 70,000 devotees are...
more...
visiting the temples daily. To cater to the surge, Khandwa MP Gyaneshwar Patil requested Central Railway GM RK Yadav and Bhusaval DRM Iti Pandey to increase MEMU train frequency and adjust timings till June 15th. The railway authorities have approved the request and the additional services will operate on June 13th, 14th, and 15th with two trips each day. From June 16th, the train will run on its regular schedule. The first trip departs from Khandwa at 9:00 AM and arrives in Sanawad at 10:30 AM. The return trip departs from Sanawad at 1:00 PM and reaches Khandwa at 2:30 PM. The second trip leaves Khandwa at 3:00 PM and arrives in Sanawad at 4:30 PM. The return trip departs from Sanawad at 5:00 PM and arrives in Khandwa at 6:30 PM. Traffic congestion is reported in Omkareshwar due to the large number of visitors. The main road from Mortakka to Omkareshwar is closed for vehicular traffic, increasing the pressure on the Sanawad-Omkareshwar route, leading to frequent traffic jams.

Omkareshwar ke paas Thapna gaon mein Pandit Pradeep Mishra ki Shiv Puran Katha chal rahi hai. Iske liye Khandwa area se bahut saare devotees aa rahe hain. Devotees ki convenience ke liye Khandwa MP Gyaneshwar Patil ne Central Railway ke GM RK Yadav aur Bhusaval DRM Iti Pandey se June 15th...
more...
tak MEMU train ke feron ko badhane aur timings adjust karne ki request ki thi. Railway ne yeh request approve kar di hai. June 13th, 14th, aur 15th ko do trips daily chalayenge. June 16th se train apne regular schedule pe chalegi. Pehla trip Khandwa se 9:00 AM par start hoga aur Sanawad mein 10:30 AM par pahunchega. Return trip Sanawad se 1:00 PM par start hoga aur Khandwa mein 2:30 PM par pahunchega. Dusra trip Khandwa se 3:00 PM par start hoga aur Sanawad mein 4:30 PM par pahunchega. Return trip Sanawad se 5:00 PM par start hoga aur Khandwa mein 6:30 PM par pahunchega. Omkareshwar mein bahut traffic jam hai because bahut saare visitors aa rahe hain. Mortakka se Omkareshwar tak main road band hai, isliye Sanawad-Omkareshwar route pe bahut traffic jam aa raha hai.
General Travel
22778 views
1

May 18 (11:59)   17665/Hazur Sahib Nanded - Mumbai LTT Weekly Express | OM/Omkareshwar Road (2 PFs)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Entry# 6068243            Tags  
Omkareswar Road must be developed as a terminus type station after Sanawad-Balwada Line is made BG. Pitlines, Sicklines, Coaching depot all must be made.
Translate to English
Translate to Hindi

More Posts
General Travel
44881 views
3

Mar 21 (07:43)   DADN/Dr. Ambedkar Nagar (Mhow) (4 PFs)
SGRFC^~
SGRFC^~   2707 blog posts
Entry# 6004456            Tags   Past Edits
MHOW KHANDWA AKOLA GAUGE CONVERSION
The main challenge of this project is their new alignments from Patalpani to Mukhtiara balwada and Tukiakhed to Adgaon bujurg. Whereas Khandwa to Sanawad, Khandwa to Amlakhurd,Akola to Akot are completed . MHOW to Patalpani , Mukhtiara balwada to Sanawad GC will be done on old alignments.
Translate to English
Translate to Hindi

More Posts
Page#    Showing 16 to 20 of 132 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy