Ratlam News: रतलाम जिले में मलेनी रेलवे ब्रिज का गर्डर चढ़ा रही क्रेन का बूम टूटा, दो घायलOn Wednesday evening, a crane's boom collapsed during the construction of a bridge over the Maleni River in Halduni as part of the Ratlam-Neemuch railway line doubling project. This resulted in injuries to the site engineer, Prashant Shekhar (29), and the crane operator, Ashish (40). The incident occurred while a girder...
more... was being lifted onto the bridge. The collapse is suspected to be due to overloading the wire holding the girder. Both injured individuals are receiving treatment at the government medical college. The project, which aims to double the railway line between Ratlam and Chittorgarh, is expected to be completed by March 2025. It includes the renovation of 18 stations, 31 major bridges, and 133 smaller bridges. The project involves a 63.94 km section from Neemuch to Dalauda and a 68.98 km section from Dalauda to Ratlam. Currently, the single railway line is experiencing a 150% load. The project is being executed by the MBPL and PGIPL companies.
Ratlam-Neemuch railway line doubling project mein Halduni mein Maleni river par bridge banaate waqt, Wednesday evening ko crane ka boom tut gaya. Crane girder chadha rahi thi, isse site engineer, Prashant Shekhar (29), aur crane operator, Ashish (40), injured ho gaye. Girder ko bandhne wale wire pe overload hone...
more... se boom tutne ka suspect hai. Dono injured ko government medical college mein treatment mil raha hai. March 2025 tak Ratlam se Chittorgarh tak double line hone wali hai. 18 stations ka renovation, 31 bade bridges, aur 133 chhote bridges banenge. Neemuch se Dalauda tak 63.94 km aur Dalauda se Ratlam 68.98 km section hai. Single line par abhi 150% load hai. MBPL aur PGIPL companies project par kaam kar rahi hain.