Pune Mumbai route: Central Railway conducts comprehensive pre-monsoon Ghat Inspection on Karjat Lonavala route hiking above hill for monsoon precautionary workThe Central Railway General Manager, Ram Karan Yadav, conducted a comprehensive pre-monsoon inspection of the Karjat-Lonavala section on the Pune-Mumbai route on April 19, 2024. This section, with 52 tunnels, steep hills, and sharp curves, is crucial for Mumbai Division operations. Yadav also inspected the Monkey Hill tunnel ghat, hiking almost...
more... 3.5 km above the hill. The inspection included examining track conditions, assessing potential rockfalls/landslides, and inspecting the maintenance of catch water drains to prevent landslides and rockfall. The inspection highlights the Central Railway's commitment to passenger safety and enhancing connectivity. The railway is also proactively cleaning existing catch water drains and building new ones to further bolster safety measures.
Central Railway ke General Manager, Ram Karan Yadav, ne 19 April, 2024 ko Pune-Mumbai route par Karjat-Lonavala section ka ek comprehensive pre-monsoon inspection kiya. Ye section, 52 tunnels, steep hills aur sharp curves ke saath, Mumbai Division ke operations ke liye bahut important hai. Yadav ne Monkey Hill tunnel ghat ka...
more... bhi inspection kiya, almost 3.5 km hill ke upar hiking karke. Inspection mein track conditions ki jaanch, possible rockfalls/landslides ka assessment, aur landslides aur rockfall ko rokne ke liye catch water drains ke maintenance ka inspection bhi shamil tha. Ye inspection Central Railway ki passenger safety aur connectivity ko improve karne ke commitment ko highlight karta hai. Railway existing catch water drains ko proactively saaf kar rahi hai aur nayi drains bhi ban rahi hai, jisse safety measures aur bhi strong honge.