Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Tue Oct 1 18:02:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 547872
Apr 10 (09:01) India's First Vertical-Lift Bridge Faces Challenges During Construction
Entry# 6025042   
  Past Edits
This is a new feature showing past edits to this News Post.
Stations:  Rameswaram/RMM   Mandapam/MMM  
Pamban bridge: India’s first vertical lift bridge over sea in Rameswaram faces ‘curve’ test

The construction of India's first vertical-lift bridge connecting the mainland to Rameswaram island is facing a challenge due to a sharp curve in the bridge's design. The 550-ton lift span, manufactured in parts and assembled at the coast, is being moved into position. The process is slow due to the curve...
more...
but is expected to be completed by the end of May. Once installed, the lift span, capable of rising 17 meters to allow ship passage, will be operational within a month, ensuring train services resume by June 30. The new bridge, built parallel to the old one, is expected to improve train speeds and traffic between the mainland and the island.

India ka pehla vertical-lift bridge, mainland se Rameswaram island ko connect karta hai, ek sharp curve ki wajah se chalane mein dikkat aa rahi hai. RVNL, yeh 2.08-km lamba bridge bana raha hai, 550 tonne ka lift span, jo 72.5-m lamba aur 16-m chauda hai, Rameshwaram se 450 m samundar mein...
more...
fix kiya ja raha hai. Is lift span ko move karne mein kaafi dikkat aa rahi hai kyunki bridge mein 2.65 degree ka curve hai. RVNL ke ek senior official ne bataya ki May tak isko fix kar diya jayega aur June 30 tak train service start ho jayegi. Yeh bridge, purane bridge ke parallel bana hai, aur train ki speed aur mainland aur island ke beech traffic ko badhayega.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy