Pics: ये है राजस्थान की सबसे बड़ी रेल सुरंग, 13 साल में पूरा हुआ सुरंग का निर्माणThe construction of Rajasthan's largest railway tunnel, located between Didwana and Indawa villages in the Lalsot area of the Dausa-Gangapur railway project, has been completed. The 2,171-meter-long tunnel, built in the Aravalli mountain range, took 13 years to complete. Train operations on the Dausa-Gangapur rail line will commence soon. The tunnel...
more... features a blast-resistant track with cement blocks laid between the ballast. Construction began on December 9, 2010. The tunnel is 2.171 kilometers long, with 796 meters of cut-and-cover tunnel. The tunnel has a height of 6.15 meters and a width of 5.20 meters.
Dausa-Gangapur rail project mein Lalsot area mein Didwana aur Indawa villages ke beech Rajasthan ki sabse badi rail tunnel ka construction poora ho gaya hai. Aravli mountain range mein bani yeh 2,171 meter lambi tunnel banne mein 13 saal lage hain. Ab jaldi hi Dausa se Gangapur rail line par train...
more... chalu ho jaayegi. Tunnel mein blast resistant track bichaaya gaya hai, matlab track par roड़ी ke beech cement ke blocks bichaye gaye hain. 9 December 2010 ko construction shuru hua tha. 2 kilometer 171 meter hai tunnel ki kul lambai. 796 meter cut and cover tunnel mein hai. 6.15 meter unchai aur 5.20 meter chauraai hai tunnel ki.