CATCH-22, Dighi port project fails due to lack of rail connectivity (along with other reasons) and the proposed rail connectivity (Dighiport-Indapur) shall fail due to failure of the port.
please wait...Translate to EnglishBro, the whole CATCH-22 situation with the Dighi port project is that it's straight-up failing because there's no rail connectivity, among other reasons. And here's the kicker, the proposed rail connectivity from Dighiport to Indapur is gonna flop too because the port itself is failing. It's a mess, man.
please wait...Translate to Hindiदिघी पोर्ट परियोजना तेलगाड़़ जुड़ाव की कमी के कारण असफल हो जाती है (अन्य कारणों के साथ) और प्रस्तावित रेल जुड़ाव (दिघीपोर्ट-इंदापुर) पोर्ट के असफल होने के कारण असफल होगा।