Central Railway's Intensive Track, OHE & Signaling Maintenance during Sunday Mega Block Ensures Uninterrupted Services for Mumbai's CommutersCentral Railway's Mumbai Division conducted extensive maintenance work across various sections on December 17, 2023, from 11:00 AM to 3:00 PM during a Sunday Mega Block. The work included critical track maintenance and overhead equipment (OHE) enhancements. Track maintenance between Thane and Kalyan on the UP and DOWN Fast lines focused...
more... on sleeper replacement, drain cleaning, track attention, bridge work, and turn-out adjustments. On the UP Fast line, a total of 2,300 meters of track was tamped and various sleepers were replaced, hauled, or stacked. On the DOWN Fast line, weld joint packing, turn-out attention, bridge approach work, and sleeper lubrication were carried out, along with extensive tamping and rail hauling/welding. The OHE work included slewing, restoration, dismantling, annual overhaul, tower wagon checking, contact wire wear reading, droppering, erection of new AC brackets, over loop contact wire installation, and annual overhaul of uninsulated overlaps. The meticulous maintenance involved 471 staff members.
Central Railway ke Mumbai Division ne 17 December, 2023 ko Sunday Mega Block ke dauran, 11:00 AM se 3:00 PM tak, bahut saare sections pe bada maintenance ka kaam kiya. Isme critical track maintenance aur overhead equipment (OHE) enhancements bhi shamil hain. Thane aur Kalyan ke beech UP aur DOWN Fast...
more... lines pe kiya gaya track maintenance mein sleepers replace karna, drain cleaning, track attention, bridge ka kaam aur turn-out adjustment shamil hain. UP Fast line pe, 2,300 meter tak track tamp kiya gaya aur bahut saare sleepers replace, haul kiye gaye ya stack kiye gaye. DOWN Fast line pe, weld joint packing, turn-out attention, bridge approach ka kaam aur sleepers lubrication kiya gaya, aur saath hi bahut saara tamping aur rail hauling/welding bhi kiya gaya. OHE ka kaam mein slewing, restoration, dismantling, annual overhaul, tower wagon checking, contact wire wear reading, droppering, new AC brackets install karna, over loop contact wire lagaana aur uninsulated overlaps ka annual overhaul shamil hain. Is meticulous maintenance ke liye 471 staff members ne kaam kiya.