Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Oct 4 13:36:05 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 547035
Bengaluru Suburban Railway Project construction: SWR allocates over 114 acres of land for corridor-4

The South Western Railway (SWR) has allocated 114.472 acres of land to the Rail Infrastructure Development Company-Karnataka Limited (K-RIDE) for the construction of Corridor-4 of the Bengaluru Suburban Railway Project (BSRP) between Heelalige and Rajanukunte. Additionally, a lease agreement for revised railway land for Corridor-2 (Mallige Line) was signed, reducing the...
more...
land area from 157.07 acres to 85.707 acres. The land allocation aims to expedite the project, which has been urged to be sped up by the Union Minister for Railways, Ashwini Vaishnaw, who expressed concerns about the lack of technical expertise in K-RIDE. The new schedule for the double-decker train (22626) operating between KSR Bengaluru and Chennai Central has been revised, with the train now departing Bengaluru at 1.30 pm and arriving in Chennai at 7.45 pm effective May 1st. The train will stop at Bengaluru Cantonment, KR Pura, Katapadi, and other stations.

South Western Railway (SWR) ne Bengaluru Suburban Railway Project (BSRP) ke Corridor-4 ke construction ke liye Heelalige aur Rajanukunte ke beech mein Rail Infrastructure Development Company-Karnataka Limited (K-RIDE) ko 114.472 acres land allocate kiya hai. Iske saath hi, Corridor-2 (Mallige Line) ke liye revised railway land ka lease agreement bhi sign...
more...
kiya gaya hai, jismein land area 157.07 acres se kam karke 85.707 acres kar diya gaya hai. K-RIDE ko land allocate karne ka matlab hai ki project jaldi complete hoga, aur Union Minister for Railways, Ashwini Vaishnaw ne is project ko jaldi complete karne ke liye kaha hai. Unhone K-RIDE mein technical expertise ki kami ke bare mein bhi concern dikhaaya hai. KSR Bengaluru aur Chennai Central ke beech mein chalne wali double-decker train (22626) ka new schedule revise kiya gaya hai. Ab yeh train Bengaluru se 1.30 pm pe chalegi aur Chennai pe 7.45 pm pe pahuchegi. Yeh new timings 1 May se effective honge. Train Bengaluru Cantonment, KR Pura, Katapadi aur other stations pe rukengi.

More Posts
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy