Bhopal Metro : भोपाल मेट्रो का काम हुआ तेज, सड़क और रेलवे ट्रैक के ऊपर ब्रिज बिछाने की मिली मंजूरीBhopal's metro construction is progressing rapidly. Two steel bridges, each over 100 meters long, are being constructed to allow the metro line to cross over existing roads and railway tracks. The bridges, designed similar to those used in Delhi's metro system, were fabricated in Alwar, Rajasthan. The first bridge,...
more... measuring 15 meters wide and 14 meters high, will be situated near the railway line between RKMSP and the DRM office. The second bridge, spanning 48 meters in length and 14 meters in height, will be located at the DRM office intersection after the railway crossing. Both bridges are designed to allow unimpeded traffic flow beneath them. The railway authorities have granted permission for the construction of the bridge over the tracks, with a specific date for the necessary track blockage yet to be decided. During this blockage, some train services may be diverted. The metro corporation must install the bridges onto their pillars within the specified timeframe. The bridges have already been assembled.
Bhopal mein metro ka kaam bahut jaldi chal raha hai. Do steel bridges, har ek 100 meter lamba, banaye ja rahe hain taaki metro line road aur railway track ke upar se ja sake. Bridges ko Delhi metro ke jaise design kiya gaya hai, aur yeh Rajasthan ke Alwar...
more... mein banaye gaye hain. Pehla bridge, 15 meter chauda aur 14 meter uncha, RKMSP aur DRM office ke beech railway line ke paas rakha jayega. Dusra bridge, 48 meter lamba aur 14 meter uncha, DRM office chouraha pe railway crossing ke baad banaya ja raha hai. Dono bridges ko is tarah se banaya gaya hai ki niche se gaadiya aaram se nikal sake. Railway authorities ne track ke upar bridge banane ki permission de di hai, lekin block kahan karenge yeh abhi decide nahin kiya gaya hai. Is din kuchh trains ko divert bhi kiya ja sakta hai. Metro corporation ko bhi time pe bridges ko pillar pe lagana hoga. Bridges ko assemble kiya ja chuka hai.