Kanpur: कुशीनगर एक्सप्रेस में 300 किलोमीटर तक बिना एसी के उबले यात्री, जमकर किया हंगामाThe Kushinagar Express (Train No. 22537) traveling from Kushinagar to Lokmanya Tilak Terminal faced severe disruptions due to malfunctioning air conditioners in four coaches. Passengers endured sweltering heat for over 300 kilometers, resulting in multiple chain pullings between Central Station and Govindpuri Station. Passengers complained about the lack of resolution despite...
more... multiple notifications and complaints. The train remained stalled for approximately three hours before a new engine was installed, finally allowing the train to depart from Govindpuri Station. The train arrived at Central Station at 9:08 AM, departed at 9:20 AM, and was delayed several times due to chain pullings triggered by frustrated passengers. Despite repeated attempts by railway staff to fix the air conditioning issue, the problem persisted, causing significant inconvenience and discomfort to the passengers. The train eventually continued its journey after a new engine was installed.
Kushinagar se Lokmanya Tilak Terminal jaane wali Superfast Kushinagar Express (Train No. 22537) mein 4 AC coach kaam nahi kar rahe the, is wajah se 300 kilometer ka safar yaatriyon ke liye bahut mushkil ho gaya. Bheeshan garmi aur umas ke beech, Central Station se Govindpuri Station ke beech aadh...
more... darjan baar chain pulling hui. Yaatriyon ne hangama karke kiraya vapas karne ki maang ki, aur kaha ki unhone bahut baar shikayat ki thi, lekin koi sunegaai nahi hui. Akhir mein, nayi engine lagakar problem door ki gayi. Train, Govindpuri Station se karib 3 ghante bad chali. Train subah 9:08 AM pe Central Station ke Platform No. 2 pe pahunchi, aur 9:20 AM pe chali. Yaatriyon ne phir se chain pulling ki. RPF mauke par pahuncha, jiske baad yaatriyon ne apni problem bataayi. Train ke B5, 6, 7 aur 9 coaches mein AC kaam nahi kar raha tha. Railway ke technical staff ne kuchh der AC ke power system ko dekha aur 9:38 AM pe train ko chala diya. Train Govindpuri Station ke Platform No. 2 se cross kar rahi thi, tabhi 9:54 AM pe yaatriyon ne phir se chain pulling ki. RPF ke SI MP Mishra staff ke saath train mein pahunche. Chain pulling B5 coach mein hui thi. Unhone yaatriyon ko samjhakar train ko chalaane ki koshish ki, lekin 10:08 AM pe phir se chain pulling hui. Aisa bahut baar hua. RPF GMC Inspector Suruchi Sharma, Railway ke technicians, aur electric staff mauke par aaye. Coach mein sawari karne wali mahilaen, bacche aur dusre yaatri bahar aaye. Suruchi Sharma ne...