Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 14 14:38:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 547440
Apr 06 (20:51) New RRTS-cum-Metro Line Proposed to Connect Ghaziabad to Noida Airport
Other News
RRTS/Rapid Train
2070 views
0

News Entry# 547440   
  Past Edits
This is a new feature showing past edits to this News Post.
DPR ready for RRTS line from Ghaziabad to Noida airport in Jewar

A 72.29km RRTS-cum-metro line connecting Ghaziabad to Noida International Airport in Jewar has been proposed, with a total of 22 stations (11 RRTS and 11 Metro). The project is divided into two sections: Section One (Ghaziabad to Kasna) and Section Two (Kasna to Noida airport). Section One, costing ₹13,055.10 crore, will...
more...
be 39.39km long with 7 RRTS and 11 Metro stations. It will integrate with the Delhi Metro at Ghaziabad, Aqua Line at Char Murti Chowk and Alpha I station, and subsume the 10km Aqua Line extension. Section Two, costing ₹6,988.50 crore, will be 32.90km long with 4 RRTS and 1 Metro stations. It will subsume the proposed 14.6km light rail transit corridor connecting the airport with Sector 21. The project is expected to take 37 minutes for travel from Ghaziabad to the airport. The DPR also proposes 10 future stations and two types of trains: one faster with limited stops and the other slower with stops at all RRTS stations. The state government approved the project in December 2023, and the DPR was submitted by NCRTC in three months.

Ghaziabad se Jewar mein Noida International Airport tak connect karne wala 72.29km ka RRTS-cum-metro line ka proposal aaya hai, jismein 22 stations (11 RRTS aur 11 Metro) honge. Project ko do sections mein divide kiya gaya hai: Section One (Ghaziabad se Kasna) aur Section Two (Kasna se Noida airport). Section One,...
more...
₹13,055.10 crore ki cost se, 39.39km lamba hoga aur ismein 7 RRTS aur 11 Metro stations honge. Ye Ghaziabad mein Delhi Metro, Char Murti Chowk mein Aqua Line aur Alpha I station ke saath integrate hoga, aur 10km Aqua Line extension ko subsume karega. Section Two, ₹6,988.50 crore ki cost se, 32.90km lamba hoga aur ismein 4 RRTS aur 1 Metro station honge. Ye airport ko Sector 21 se connect karne wala proposed 14.6km light rail transit corridor ko subsume karega. Project se Ghaziabad se airport tak pahunchne mein 37 minutes lagne ki ummeed hai. DPR mein 10 future stations aur do types ki trains ka bhi proposal hai: ek faster, limited stops ke saath aur dusri slower, saare RRTS stations par stops ke saath. State government ne December 2023 mein project ko in-principle approval di thi, aur NCRTC ne teen mahino mein DPR submit kar di.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy