No Operations on Shaibabad to Duhai Stretch of RRTS Till MondayThe National Capital Region Transport Corporation (NCRTC) has temporarily suspended operations on the 17km priority stretch of the Delhi-Ghaziabad-Meerut RRTS corridor. This closure is to facilitate signalling integration trials between the 17km priority section and the 25km section from Duhai to Meerut. The 25km stretch is planned to open by March...
more... 2023, necessitating the integration of various systems, including signalling. The stretch between Ghaziabad and Meerut is also expected to be operational by March. Trial runs are underway on this section, with NCRTC aiming for a CMRS inspection once trains reach a design speed of 180kmph within the next month. The Delhi-Ghaziabad-Meerut RRTS, with a total cost of Rs 30,000 crore, has so far incurred Rs 18,160.81 crore, roughly 59.9% of the allocated funds. This 82.15km Rapid Rail Transit System connects Delhi's Sarai Kale Khan to Ghaziabad and Meerut, with the initial phase of the priority corridor covering 17km and encompassing five stations: Sahibabad, Ghaziabad, Guldhar, Duhai, and Duhai Depot. Prime Minister Modi launched India's first RAPIDX train, Namo Bharat, from Sahibabad Station on October 20th. These trains achieve a maximum speed of 180km/h and offer ticket prices ranging from Rs 20 to Rs 50 for standard coaches and Rs 50 to Rs 100 for premium coaches.
Delhi-Ghaziabad-Meerut RRTS ke 17 km priority stretch pe operation rok diye gaye hain, kyunki NCRTC 17 km priority section aur Duhai se Meerut tak ke 25 km section ke beech signalling integration trials karne wala hai. March 2023 tak 25 km stretch khulne wala hai, isliye signalling system sahit saare systems...
more... ko integrate karna jaruri hai. Ghaziabad aur Meerut ke beech wala stretch bhi March tak chalne lagega. Is stretch pe abhi trial runs chal rahe hain aur NCRTC ka target hai ki aagle mahine train 180 kmph ki design speed achieve kar le, jisse CMRS inspection ho sake. Delhi-Ghaziabad-Meerut RRTS pe ab tak Rs 30,000 crore mein se Rs 18,160.81 crore kharch ho chuke hain, jo ki allocated funds ka 59.9% hai. Yeh 82.15 km long Rapid Rail Transit System, Delhi ke Sarai Kale Khan ko Ghaziabad aur Meerut se jodta hai. Priority corridor ka pehla phase 17 km lamba hai aur isme 5 stations hain: Sahibabad, Ghaziabad, Guldhar, Duhai, aur Duhai Depot. Prime Minister Modi ne 20 October ko Sahibabad Station se India ki pehli RAPIDX train, Namo Bharat, launch ki thi. Ye trains 180 km/h ki maximum speed achieve karti hain aur ticket prices standard coaches ke liye Rs 20 se Rs 50 aur premium coaches ke liye Rs 50 se Rs 100 hain.