MMRDA floated tender for construction of 22-km long Mumbai Metro Line 12The Mumbai Metropolitan Region Development Authority (MMRDA) has re-issued tenders for the civil construction of Mumbai Metro's Line-12 (Orange Line), a 22.17 km elevated line with 19 stations connecting Kalyan, Dombivali, and Amandoot (Taloja). This line will be an extension of the under-construction Line-5 (Thane – Bhiwandi – Kalyan). Originally planned...
more... as two separate packages, the project has been consolidated into a single tender, CA-240, with an estimated cost of Rs 4,132 crore. The project's scope includes the construction of an elevated viaduct, 19 stations, and a connecting line to the depot. The northern terminal of Line-12 will now be at Kalyan Railway Station, incorporating two new stations from Line-5. Line-5's length has been shortened due to the integration of the Kalyan – Ganesh Nagar section into Line-12. This re-tendering reflects MMRDA's dedication to optimizing Mumbai's metro network and improving transportation within the city.
Mumbai Metro ki Line-12 (Orange Line) ke liye, MMRDA ne civil construction ke tenders dobara issue kiye hain. Yeh 22.17 km lambi line 19 stations ke saath Kalyan, Dombivali aur Amandoot (Taloja) ko connect karegi. Yeh under-construction Line-5 (Thane – Bhiwandi – Kalyan) ka extension hoga. Pehle do alag packages mein...
more... plan kiya gaya tha, ab project ko ek single tender, CA-240 mein consolidate kiya gaya hai, jiska estimated cost Rs 4,132 crore hai. Project mein elevated viaduct, 19 stations aur depot se connecting line ka construction shamil hai. Line-12 ka northern terminal ab Kalyan Railway Station pe hoga, jisme Line-5 ke do new stations include kiye gaye hain. Line-5 ki length kam ho gayi hai kyunki Kalyan – Ganesh Nagar section ko Line-12 mein integrate kiya gaya hai. Ye re-tendering MMRDA ki dedication ko reflect karta hai ki Mumbai ka metro network optimize kiya jaaye aur city mein transportation improve ho.