Railway track between Intekanna and Kesamudram restored, trains start runningThe South Central Railway (SCR) announced on Wednesday (September 4, 2024) that a single line track between Intekanna and Kesamudram was restored, with the second track expected to be restored later that night. The double track between Tadlapusapalli and Mahabubabad was fully repaired. The track was declared fit for train traffic...
more... at 9 a.m. on Wednesday, with the Golconda Express becoming the first passenger train to cross the restored tracks at 2.30 p.m. The railway track between both sections was damaged in 15 locations, with restoration works completed by engineers and over 800 workers using 30,000 cubic meters of soil, 5,000 cu/m of ballast, and 6,000 cu/m consolidation special soil. A special train with boulders and sandbags, along with various equipment, was used for the restoration.
South Central Railway (SCR) ne Wednesday (September 4, 2024) ko announce kiya ki Intekanna aur Kesamudram ke beech single line track restore ho gaya hai, aur dusra track ushi raat ko restore hone ki ummid hai. Tadlapusapalli aur Mahabubabad section ke beech double track fully repair ho gaya hai. Track...
more... Wednesday ko subah 9 baje train traffic ke liye fit declare kiya gaya, aur Golconda Express 2.30 baje pehle passenger train ban gaya jo restored track se gujara. Dono sections ke beech railway track 15 jagah pe damage hua tha, aur engineers aur 800 se zyada workers ne 30,000 cubic meters soil, 5,000 cu/m ballast, aur 6,000 cu/m consolidation special soil ka use karke restoration ka kaam pura kiya. Restoration ke liye boulders aur sandbags wala special train aur saath hi kaafi equipment bhi use kiya gaya.