Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 27 03:23:30 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6201371
Posted: Sep 25 (20:12)

No Responses Yet
Rail News
2154 views
0

Metro
Sep 25 (20:12)   Namo Bharat Metro Line to Connect Ghaziabad to Noida International Airport: NCRTC's Ambitious Project

Exynos9611~   20078 news posts
Entry# 6201371         Tags   Past Edits
Namo Bharat Metro line: 22 stations coming up in Noida, check out what places will be covered by 2031

The National Capital Region Transport Corporation (NCRTC) is constructing the Namo Bharat Metro line, connecting Ghaziabad to the upcoming Noida International Airport in Jewar. This 72.4 km line with 22 stations will run from Siddharth Vihar in Ghaziabad through key areas like Sector 71 in Noida, Greater Noida West, Tech Zone...
more...
4, and Pari Chowk, ending at the airport. The NCRTC conducted a population survey to understand the growing transportation needs and ensure the metro system is efficient and future-ready. The project aims to ease travel between Delhi NCR and the airport, improve connectivity across the region, and address the rising demand for public transportation in Noida and Greater Noida. The metro is expected to be completed by 2031, but this timeline has not been independently verified.

National Capital Region Transport Corporation (NCRTC) Namo Bharat Metro line bana raha hai, jo Ghaziabad se Jewar mein banne wala Noida International Airport tak jaayega. Yeh 72.4 km lambi line 22 stations se hoke guzaregi aur Ghaziabad mein Siddharth Vihar se shuru hoke Noida mein Sector 71, Greater Noida West,...
more...
Tech Zone 4 aur Pari Chowk se hoti hui airport tak jaayegi. NCRTC ne ek population survey kiya hai, jisse woh jan sakte hain ki region mein public transport ki kitni demand badh rahi hai aur yeh metro system efficient aur future-ready kaise banaya jaaye. Project ka maqsad Delhi NCR aur airport ke beech travel ko aasaan karna, region mein connectivity badhana aur Noida aur Greater Noida mein badhti hui public transport ki demand ko address karna hai. Metro ke 2031 tak complete hone ki ummeed hai, lekin is timeline ko alag se verify nahi kiya gaya hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy