जुगसलाई रेलवे क्रॉसिंग पर फुट ओवरब्रिज का काम शुरूConstruction of a foot overbridge at the Jugsalai railway crossing has begun. The railway department has announced that the 3-meter wide and 15-meter long bridge will cost over 1.66 crore rupees. The bridge is planned to be completed by the second week of October, aiming to reduce pedestrian traffic on the...
more... closed crossing. The bridge's pillars are already in place, with the structure being fabricated elsewhere and planned to be fixed to the pillars during a line block. The demand for a foot overbridge at this location has been raised since 1973, and the project is intended to improve safety and facilitate pedestrian movement across the railway line.
Jugsalai railway crossing pe foot overbridge banne ka kaam shuru ho gaya hai. Railway department ne bataya ki 3 meter chauda aur 15 meter lamba overbridge banane mein 1 crore 66 lakh rupees se zyada kharch hoga. Overbridge October ke dusre hafte tak ban kar tayyar ho jaayega, yeh plan hai....
more... Bridge ke pillars already lag gaye hain, aur structure banne ke baad line block karke pillars mein fix kiya jaayega. 1973 se hi is crossing pe foot overbridge ki demand uth rahi thi, aur yeh project safety ko badhane aur railway line cross karne wale logon ke liye aasaan banane ke liye hai.