sir, the route your are suggeting need loads of funds (which IR is running dangerously low levels right now and possibly till coming 5 years and more). Plus IR can de-congest and speed up the traffic on the existing network with much lesser funds by adding a 3rd line between PNBE-MGS (GAYA-MGS 4th line will be operational soon)