Eastern Railway : লেভেল ক্রসিংয়ে অপেক্ষার দিন শেষ, যাত্রী দুর্ভোগ এড়াতে নয়া পথ রেলেরThe Eastern Railway is building road under bridges (RUBs) at level crossings to eliminate the need for foot over bridges (FOBs) and reduce delays for both passengers and trains. This initiative aims to create alternative pathways for pedestrians and vehicles, eliminating the need to stop at level crossings. To facilitate construction,...
more... occasional rail blocks on Saturdays and Sundays are being implemented. These RUBs are being built in both the Howrah and Sealdah divisions of the Eastern Railway.
Eastern Railway abhi level crossing pe road under bridges (RUBs) banwa raha hai. Yeh FOBs ka replacement hai aur passengers aur trains dono ke liye delays kam karega. Isse logon ko level crossing par rukne ki jarurat nahi padegi aur unhe aane jaane ke liye alternate rasta mil jaayega....
more... Yeh RUBs Howrah aur Sealdah dono divisions mein banaye jaa rahe hain. Iska kaam shuru ho gaya hai aur iske liye Saturdays aur Sundays ko rail blocks bhi kiye ja rahe hain.