Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 9 14:36:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6079068
Posted: May 29 (20:28)

No Responses Yet
Rail News
6195 views
0

Metro
May 29 (20:28)   Bhopal Metro's Priority Corridor Completes Trial Runs, Second Phase Construction Begins

Exynos9611~   18807 news posts
Entry# 6079068   News Entry# 554079         Tags   Past Edits
भोपाल मेट्रो के दूसरे फेज में मिट्‌टी की टेस्टिंग शुरू:₹1540 करोड़ में बिछेगी 8.77Km लाइन; सेफ्टी-डायवर्सन पर मंथन

Bhopal's Metro priority corridor has successfully conducted a trial run with trains reaching speeds of 80 km/h. Preparations for commercial operations are underway. Meanwhile, construction has begun on the second phase of the Metro, which will extend the line by 8.77 km from Subhash Nagar to Karond. This phase...
more...
includes a 3.39 km underground section, for which discussions are taking place regarding safety measures and route diversions. The underground section will primarily be on government land with some private land acquisition. The orange line, which runs from AIIMS to Karond, is 14.99 km long. The priority corridor, spanning from Subhash Nagar to AIIMS (6.22 km), underwent trial runs in October 2023. Construction on 5 out of 8 stations (Rani Kamlapati, Subhash Nagar, Kendriya School, opposite DB Mall, and MP Nagar) is over 90% complete. Civil work at AIIMS, Alkapuri, and DRM Office stations is finished, while finishing touches are being completed. The DRM Office intersection is under construction for a steel bridge over the railway tracks. Construction of a second steel bridge over the main road is also underway. Both bridges are being built in Alwar, Rajasthan, and are designed similarly to Delhi's Metro. A total of 5 Metro trains have arrived in Bhopal and have undergone speed trials at 80 km/h. The second phase of the project is split into two parts. The first part involves building 6 elevated stations along a 5.38 km stretch from Subhash Nagar Depot to Karond, costing ₹650 crore. The second part involves constructing a 3.39 km underground section with 2 stations at Bhopal Railway Station and Nadra Bus Stand, costing ₹890 crore.

Bhopal ka Metro priority corridor me 80 km/h speed pe train chal chuki hai, aur commercial run ke liye taiyaariyan shuru ho gayi hain. Iske saath hi, Metro ke dusre phase ka kaam bhi shuru ho gaya hai. Subhash Nagar se Karond tak 8.77 km line bhichengi. Isme...
more...
3.39 km underground route bhi hai, jiske liye safety aur route divert karne ki baat chal rahi hai. Underground section zyaadaatar sarkaari zameen par hoga, kuchh private land bhi include hoga. Orange line, jo AIIMS se Karond tak hai, 14.99 km lambi hai. Subhash Nagar se AIIMS tak (6.22 km) ka priority corridor October 2023 me trial run hua tha. 8 me se 5 stations (Rani Kamlapati, Subhash Nagar, Kendriya School, DB Mall ke saamne, aur MP Nagar) ka kaam 90% se zyada complete ho chuka hai. AIIMS, Alkapuri, aur DRM Office stations ka civil work khatam ho gaya hai, aur finishing ka kaam chal raha hai. DRM Office chaurahe par railway track ke upar se steel bridge ban raha hai. Dusra steel bridge bhi main road ke upar ban raha hai. Donon bridges Alwar, Rajasthan me ban rahe hain, aur design Delhi Metro jaisa hai. Bhopal me ab tak 5 Metro trains aa chuki hain, aur 80 km/h ki speed pe trial run ho chuka hai. Dusre phase ke project ko do parts me baanta gaya hai. Pehle part me Subhash Nagar Depot se Karond tak 5.38 km stretch par 6 elevated stations banenge, jiske liye ₹650 crore kharch hoga. Dusre part me 3.39 km underground section banenge, jisme 2 stations Bhopal Railway Station aur Nadra Bus Stand par honge, aur iske liye ₹890 crore kharch hoga.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy