Blog Entry# 6045497
Posted: Apr 27 (09:49)
1 Responses
Last Response: Apr 27 (09:57)
Had a RF session at DEOS after a very long time.Station redevelopment work is in progress at full pace with shed extension work,boundary wall construction completed at outer on gkp end and pf works going on. There is a TE limit on the bridge 500 m ahead.Spotted 12553 with 37249 Cnb Wap 7 which was running late by 27 minutes.On pf 3 came 15708 which was running late by 6 hours led by LDH Wap 7 30803.12553 took a long halt of half hour due to some block on up line so was not able to capture the departure. ...
more...
SB pic and loco in frame.