FLS for construction of Bye-pass line at Dhone (12.78 km )
Carrying out FLS for construction of Bye-pass line at Dhone (12.78 km ) like fixing of alignment, pegging out center line, taking levels and finalization of land acquisition proposals, soil investigations, geological investigations for bridges by drilling bore holes, collecting samples, calculation of water way requirement for all the proposed bridges and preparations of GAD's of bridges, station yards, project sheets and submission of detailed estimate complete in all respects with different survey works requiring to be carried out using LiDAR...
more... Technology, making EPC documents based on the FLS survey conducted for calling EPC tender and (ii) Preparation of land acquisition proposals for doubling between Perrur - Dhone stations (141.12 Km) of MBNR - DHNE section in Wanaparthy district, JogulambaGadwal Dist., Kurnool Dist., and Nandyal Dist.
click here
please wait...Translate to HindiDhone mein Bye-pass line banane ke liye FLS ka kaam (12.78 km) kar rahe hain jaise alignment fix karna, center line ko peg out karna, levels lena aur land acquisition proposals finalise karna, soil aur geological investigations karna bridges ke liye by drilling bore holes, samples collect karna, water way requirement calculate karna proposed bridges ke liye aur GAD's banane ka tayari karna bridges, station yards, project sheets aur detailed estimate submission complete in all respects with different survey works requiring to be carried out using LiDAR Technology, EPC documents taiyar karna based on the FLS survey conducted for calling EPC tender and (ii) Perrur - Dhone stations ke beech land acquisition proposals ki tayari karna doubling ke liye MBNR - DHNE section mein Wanaparthy district, JogulambaGadwal Dist., Kurnool Dist., aur Nandyal Dist. area ke liye.
yahaan click karein