Chennai Metro Signs Contract with ST Engineering for Platform Screen DoorsChennai Metro Rail Limited (CMRL) has awarded a contract worth INR 159.97 crores to ST Engineering Urban Solutions Ltd. for the installation of Platform Screen Doors (PSD) System on two elevated sections of Corridor-3 (Sholinganallur Lake to Sipcot 2) and Corridor-5 (Grain Market to Elcot) as part of the Phase-II project....
more... The contract includes the provision of half-height Platform Screen Doors for 36 elevated stations, which will enable driverless train operations, enhancing safety for passengers and operations. ST Engineering Urban Solutions Ltd. will be responsible for the design, manufacture, supply, installation, testing, and commissioning of the complete integrated Platform Screen Door System, including control centers, platforms, and equipment room sub-systems. This collaboration aims to advance the metro rail network and enhance safety and efficiency in public transportation.
Chennai Metro Rail Limited (CMRL) ne ST Engineering Urban Solutions Ltd. ko INR 159.97 crore ka contract diya hai, Platform Screen Doors (PSD) System ko install karne ke liye. Ye contract Corridor-3 (Sholinganallur Lake se Sipcot 2) aur Corridor-5 (Grain Market se Elcot) ke do elevated sections pe hoga, jo Phase-II...
more... project ka part hai. Contract mein 36 elevated stations ke liye half-height Platform Screen Doors include hai, jisse driverless train operations possible hoga, aur passengers aur operations ki safety badhegi. ST Engineering Urban Solutions Ltd. design, manufacture, supply, installation, testing, aur commissioning ka responsibility lega, jisme control centers, platforms, aur equipment room sub-systems bhi include hai. Is collaboration ka aim hai metro rail network ko improve karna aur public transport mein safety aur efficiency badhana.