Major Milestone Achieved in USBRL Project: 3209m Long Tunnel T-1 BreakthroughThe 3209m long Tunnel T-1 on the Udhampur-Baramulla Rail Link (USBRL) project between Katra and Reasi stations has been completed by Konkan Railway Corporation Limited (KRCL). This tunnel was the longest and most challenging on the USBRL project, due to its passage through the Himalayan Main Boundary Thrust (MBT) and facing...
more... numerous geological obstacles, including rugged terrain and substantial water inflow. Work on the tunnel was interrupted multiple times, including a rockslide in 2017, but the project was completed using advanced techniques and resilience. With the completion of Tunnel T-1, all tunnels on the USBRL project are now finished, marking a significant milestone in enhancing connectivity in the region.
Udhampur-Baramulla Rail Link (USBRL) project mein Katra aur Reasi station ke beech 3209m lamba Tunnel T-1, Konkan Railway Corporation Limited (KRCL) dwara successfully complete ho gaya hai. USBRL project ka yeh tunnel sabse lamba aur challenging tha, kyonki yeh Himalayan Main Boundary Thrust (MBT) se ho kar guzarta hai aur iske...
more... saamne kai geological difficulties aayi, jaise ki rugged terrain aur tunnel ke andar se paani ka bahut zyada aana. Tunnel par kaam kai baar ruk gaya, jaise ki 2017 mein ek rockslide, par project ko advanced techniques aur resilience se pura kiya gaya. Tunnel T-1 ke complete hone se USBRL project ke sabhi tunnels ab complete ho gaye hai, jo ki is region mein connectivity ko badhane ke liye ek important milestone hai.