Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 16:36:04 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5902525
Posted: Dec 06 2023 (08:18)

3 Responses
Last Response: Dec 06 2023 (17:02)
Rail News
36457 views
0

IR Affairs
SWR/South Western
Dec 06 2023 (08:18)   Bangalore Suburban Railway Project Faces Delays: Urgent Need to Speed Up ‘Sampige’ Corridor for Airport Connectivity

karbang~   1804 news posts
Entry# 5902525   News Entry# 532814         Tags   Past Edits
ಬೆಂಗಳೂರು: ಮೆಜೆಸ್ಟಿಕ್‌-ಏರ್‌ಪೋರ್ಟ್‌ ರೈಲು ಮಾರ್ಗ ನೆನೆಗುದಿಗೆ

The Bangalore Suburban Railway project, particularly the ‘Sampige’ corridor connecting Majestic to the Kempegowda International Airport, is facing delays. While the ‘Mallige’ corridor between Baiyappanahalli and Chikkabanavara is underway, the tender process for the ‘Sampige’ corridor has been slow, causing dissatisfaction among transportation experts. The ‘Sampige’ corridor was initially prioritized by...
more...
the central government for its crucial role in connecting the airport, expecting it to be completed within three years, compared to six years for other corridors. Despite the urgent need for this connection, the state government is focusing on the ‘Mallige’ corridor. The ‘Sampige’ corridor is vital due to the increasing traffic to the airport, which is expected to reach 4-5 lakh passengers in the next few years. While a 58 km metro line connecting the airport will be completed by 2027, it will only serve 25% of the city, highlighting the importance of the suburban railway. Transportation experts emphasize the need to accelerate the ‘Sampige’ corridor project and suggest starting the ground-level work between Yeshwanthpur and Lottegollahalli, prioritizing the project’s completion within three years. They also point out the lack of a full-time managing director and the absence of continuous monitoring by the government as contributing factors to the delay. The project faces challenges with land acquisition but can be addressed through separate tenders for the ground-level work in Lottegollahalli, Yelahanka, and Devanahalli. The ‘Sampige’ corridor is the first of the suburban railway corridors, covering 41.4 km with an estimated cost of ₹5060 crore. It includes 8 elevated and 7 ground-level stations, connecting various locations including KSR Bangalore, Srirampura, Malleshwaram, Yeshwanthpur, Mathikere, Lottegollahalli, Kodigehally, Judicial Layout, Yelahanka, Nitte Meenakshi, Bettahalaasuru, Doddajala, Airport Trumpet, Airport Terminal, Airport KIADB, and Devanahalli.

Bangalore ka Suburban Railway project, khass karke 'Sampige' corridor jo Majestic se Kempegowda International Airport connect karta hai, bahut delay ho raha hai. 'Mallige' corridor, Baiyappanahalli se Chikkabanavara tak, chal raha hai, par 'Sampige' corridor ka tender process bahut slow hai, jisse transport experts bahut upset hain. 'Sampige' corridor ko pehle...
more...
hi central government ne priority diya tha, kyunki yeh airport connect karta hai aur unka expect tha ki yeh 3 saal mein complete ho jayega, jabki dusre corridors ke liye 6 saal diya gaya tha. Is important connection ki urgent zaroorat ke baavajood, state government 'Mallige' corridor pe focus kar raha hai. 'Sampige' corridor bahut important hai kyunki airport ka traffic bahut badh raha hai, aur aage aane wale 4-5 saal mein 4-5 lakh passengers aa jayenge. 2027 tak, airport connect karne wala 58 km ka metro line complete ho jayega, par yeh city ka sirf 25% hi serve karega, isse suburban railway ki importance samjh aati hai. Transport experts 'Sampige' corridor project ko jaldi complete karne ka zor dete hain aur suggest karte hain ki Yeshwanthpur aur Lottegollahalli ke beech ground level ka kaam pehle shuru kiya jaaye, aur project ko 3 saal mein complete karne ki priority di jaaye. Unhone yeh bhi bataya hai ki managing director ka full time nahi hona aur government ki continuous monitoring ka na hona bhi delay ka ek reason hai. Project ko land acquisition ki wajah se challenges aarahi hai par yeh challenge Lottegollahalli, Yelahanka aur Devanahalli mein ground level ka kaam alag alag tenders ke through karke solve kiya ja sakta hai. 'Sampige' corridor suburban railway ka pehla corridor hai, yeh 41.4 km lamba hai aur iski estimated cost ₹5060 crore hai. Isme 8 elevated aur 7 ground level stations hain, yeh KSR Bangalore, Srirampura, Malleshwaram, Yeshwanthpur, Mathikere, Lottegollahalli, Kodigehally, Judicial Layout, Yelahanka, Nitte Meenakshi, Bettahalaasuru, Doddajala, Airport Trumpet, Airport Terminal, Airport KIADB aur Devanahalli ko connect karta hai.

Rail News
29193 views
0

Dec 06 2023 (11:58)
irifan2015~
irifan2015~   2504 blog posts
Re# 5902525-1              
Winners are Ola Uber BMTC
Translate to English
Translate to Hindi

29714 views
1

Dec 06 2023 (14:03)
deepak.yerr~
deepak.yerr~   6603 blog posts
Re# 5902525-2              
Air traveller will not fully depend on BMTC vayu vajra while flying out in intermediate busstops, only the one who has lot of leisure time. Air travellers mostly take BMTC to reach home and business travellers and official trips take ola/Uber as they get refund. You can't expect South and West to come to BNC. They should be separate trains from Whitefield, Kengeri via Central Yesvantpur and BNC every hour.
Translate to English
Translate to Hindi

27660 views
0

Dec 06 2023 (17:02)
irifan2015~
irifan2015~   2504 blog posts
Re# 5902525-3              
If there are dedicated hourly trains, people can take such services.
While I agree that south (Jayanagar JP Nagar BTM etc) may not like to go via BNC, Koramangala /Sarjapur road/ HSR can travel to BNC if direct buses are there. Now not even a single bus is there from these areas to Cantonment station. Similarly, west (Rajaji nagar/ Vijaya nagar/ Kengeri) like to go via SBC instead of via BNC.
Malleshwaram, Yeshwantpura, Sadashiv nagar people will not come to BNC.
What
...
more...
is the point of running few services from BNC? Just to say that we have done our part and now it is upto public to utilise them or not?

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6007860 ★★★ 115RailwayFiles~
3368675 ★★★ 395mr.train_wala~
3619297 ★★★ 397HBR^~
6186110  13Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy