I'd they introduce train towards Vskp they have to bypass Samalkot for which local public should be ready.
2. Morning there are number of trains from SLo to Vskp giving new path is difficult. They have moved afternoon Vskp arrival trains to morning.
3. They are enough of trains from Vskp to Palasa, BAM, BBS during daytime. If SCR is ready to take either BAM or BBS by extention it will be possible.