Political pressure is what got us Vasco Patna SF. And train is running successfully ever since then. Previously the same loco used to reverse at MAO now after electrification of KR different locos are used. And VSG has lots of freight locos at their disposal now which await their duties.
Also slack could be adjusted between MAO to VSG with change in TT upto MAO and slack given between MAO to VSG.