Statutory Inspection of RE works followed by speed trial at full sectional speed(110Kmph) in Bikaner Jn-Nagaur(115.83RKM/137.83TKM)single line section of Jodhpur and Bikaner Divisions of NWR completed successfully. With this,total commissioning by CORE during2022-23 is 2272RKM /3035.8TKM.