Inspection of RE works followed by speed trial at full sectional speed(40Kmph) in Nadiad-Kapadvanj (45.63RKM/49.26TKM) single line section of Vadodara Division of WCR completed successfully. With this,total commissioning by CORE during 2022-23 is 1940RKM/2638TKM