MMRC achieves its 42nd & final Breakthrough today at Mumbai Central Metro Station on the Colaba-Bandra-SEEPZ Metro-3 corridor. With this breakthrough a major milestone is accomplished, and 100% tunneling scope of 54.5 km has been completed on the entire stretch.
#mumbai #metro #line3 #aqua