It was slated to connect Paralakhemundi with Singapuram. But NG line was not made after it reached Gunupur. Gunupur to Singapuram line was be laid via Penkambhadra, Ramnaguda, Malikeswar-Mukundapura, Tikarpada, Rengalpadu & Bangaramma. Since it required 4 nos tunnel to be built, 3 between Ramnaguda & Malikeswar-Mukundapura & 1 between Malikeswar-Mukundapura & Tikarpada & 2 railway bridges on Vamsadhara & Nagavalli Rivers, the line was not made further