Design, Supply, Erection, Testing and Commissioning of 25kV, 50 Hz, Single Phase, AC Electrification Works including OHE & TSS as Composite Electrical Work” in Mysuru(Excl)- Hassan(Incl)- Mangaluru(Excl)/ Arsikere(Excl) section Gr. 299 of Mysuru Division of South Western Railway.
The total estimated cost of Electrification of Mysuru Mangaluru Railway Lines is 110.50 crore with a completion period of 24 months from the date of award of work. Electrification is to be carried out for a total of 347 RKM /410 TKM. Ranking order for Bids is lowest to highest.