CRS/N circle Sh S K Pathak,CCRS inspected
#doubling and
#electrification works of Amethi - Gauriganj (15.40 km, three stations , two block sections) section of Lucknow Div, N Rly. The trial was conducted at a speed of 133 kmph, and 110 kmph speed was authorized by CCRS
#rvnl #crs