As of now they have laid the main line till deoband and from tapri to deoband 30%. Looplines and platform are under-construction and signalling and electrification have not started.
and also they should break the two link express 1)Ddn/Cdg Mdu and 2)Mtc Mandsor Express from Dehradun Bandra as the ARP is cancelled.