I hope the people who gave these proposals at least had an idea about the congestions, constraints etc which SWR keeps on talking about. Some of the suggestions are genuine but at least larger aspects of pf availability in stations like Bangalore, YPR, single line stretch in Hosur-SBC stretch, etc need to be thought through