Nothing much to show for yesterday....but still was enough for me....
.
Pic 1: "Brand New" Howrah HOG WAP-7 #37169 resting at Howrah PF 12 after hauling 12340 Coalfield Express
Pic 2: OFFLINK Santragachi WAP-7 #37106 going light from Howrah PF 9 after the departure of 12509 Bengaluru Cantt. to Guwahati Express
Pic...
more... 3: The Reversible Track between New Alipur (NACC) and Lake Gardens (LKF) is functional now along with PF 2 of Tollygunge (TLG). Since the signalling is not yet functional, so all trains were passing at SPAD and thus there was an average delay of 45 minutes in UP Direction and little less in DN Direction.